Laserfiche WebLink
Castle Rock Synthetic Turf Project <br />Application for Water Efficiency Grant <br />Table 4: Roles and Responsibilities <br />Party Person Position Rate Role <br />Town of Castle Karen Public $32.45/hr Work with Rick Schultz in developing the materials <br />Rock - McGrath Relations and activities needed for the public education effort <br />Community Manager Publication of an article on the project in the local <br />Relations newspaper <br /> Work with the local TV stations to develop a TV <br /> promotion on the project <br /> Add information on the project to Castle Rock's water <br /> conservation website <br /> Incorporate information on the project in the Water <br /> Wise class education materials <br />Town of Castle Curt Park $42.67/hr Conduct daily construction inspections <br />Rock -Parks Williams Maintenance Inspect irrigation installation features to ensure <br />Department Superintendent effective operation <br />DCSD John Project $36.00/hr Coordination with Jeff Smullen (Castle Rock's Park <br /> Conklin Manager for Department) on the final design, construction <br /> DCSD inspections, and overall construction effort <br /> Facilitate the development of the final design <br /> documents and communications with the design <br /> contractors <br /> Coordinate funding of DCSD's share of the project <br />Design Carol Principle n/a Design the architectural components of the project <br />Concepts Henry Landscape <br />Landscape Architect <br />Architects <br />JVA Civil Matt Civil Engineer n/a Design the civil engineering component of the project <br />Engineers Oscamou <br />Contractor(s) Unknown Unknown n/a Coordinate all activities with Jeff Smullen (Castle <br /> Rock's Parks Department) <br /> Perform all construction activities specified in the final <br /> design. This includes purchase of materials and <br /> construction. <br />5.0 Project Schedule <br />Castle Rock and DCSD plan to complete construction by early August 2008, in order <br />to host classes at the elementary school begint~itlg in the 2008/2009 school year. The <br />preliminary project schedule identifying key activities and milestones is presented in <br />Table 5 based on an anticipated school opening of Fall 2008. These dates are <br />contingent on receipt of the grant funds, weather, and any tecluucal installation <br />factors that could occur. All billed materials and work conducted prior to the CWCB <br />grant purchase order will be paid by Castle Rock /DCSD as a portion of their local <br />cost share. <br />17 <br />