Laserfiche WebLink
<br />Figure 5.1 - SCFP Treatment Capacity and Projected District Demands <br /> <br />100 ------------------------------------------------------------------ <br />6' 90 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br />CJ 80 <br />6 70 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br />~ 60 ----------------- <br />"[5 <br />~ 50 <br />ro 40 <br />() <br />c... 30 <br />~ 20 <br />(j) 10 <br />o <br />11111..........1.111111111 <br /> <br /> <br />1~1 NWCWD c=J ELCO c=J FCLWD -SCFP Capacity (MGD) <br /> <br />The 10 mgd treatment plant expansion planned for 2012 will replace tube settlers in <br />existing basins with dissolved air flotation equipment. Four new filter basins will also be <br />constructed. Utilization of existing basins inside the treatment facility will make the next <br />10 mgd plant expansion relatively inexpensive. <br /> <br />Table 5.1 shows preliminary cost estimates for the planned expansion. Costs and <br />capacities shown in Table 5.1 are for the total project. The cost of the plant expansion <br />will be shared among the three Districts that own the SCFP. ELCO would pay its <br />proportionate share of project costs based on its relative water use at the time of <br />construction. <br /> <br />Table 5.1 - Estimated Cost of SCFP Expansion Planned for the Year 2012 <br /> <br /> Estimated Unit Cost of <br /> Cost Capacity Capacity <br />Permitting N/A <br />Land Acquisition N/A <br />Construction $3,600,000 <br />Subtotal $3,600,000 <br />Design & Construction Contingency (200/0) $720,000 <br />Subtotal $4,320,000 <br />Engineering (120/0) $518,400 <br />Total $4,838,400 10 mgd $4.84 per gallon <br />Present Value of Unit Cost of Capacity @ 50/0 $3.80 per gallon <br /> <br />Clear Water Solutions, Inc. <br />East Larimer County Water District <br /> <br />2007 Water Conservation Plan <br /> <br />41 <br />