My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SWSI Phase 2 SOW_6-10-05
CWCB
>
SWSI II Technical Roundtables
>
DayForward
>
SWSI Phase 2 SOW_6-10-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 10:30:04 AM
Creation date
1/8/2008 3:27:18 PM
Metadata
Fields
Template:
SWSI II Technical Roundtables
Title
SWSI Phase 2 Scope of Work
Date
6/10/2005
SWSI II - Doc Type
Scope of Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SWSI Phase 2 Scope of Work <br />^ Identify sources of information, previous plans/studies, etc. <br />Assumptions/Basis of Costs <br />^ Consultant will conduct a total of four meetings <br />^ Each Steering Committee meeting will last approximately 2 hours in duration <br />^ CWCB Steering Committee meetings will consist of CWCB Advisory Board, senior <br />CWCB management and staff, and a member from the Consultant team <br />Summary of Deliverables <br />^ Steering committee meeting minutes <br />Task 2 -Process Overview of Phase 2 Technical Roundtables <br />Task 2.1 Formation of Technical Roundtables <br />Purpose <br />The purpose of each TRT is to discuss items identified in a statewide forum with <br />roundtable participants from multiple basins. <br />Approach <br />Schedule <br />The detailed schedule is attached. <br />Topics <br />Potential draft topics for TRT discussions are attached. The Consultant will facilitate <br />discussion in each TRT on institutional, technical, financial, and legal issues. <br />Membership <br />^ Diverse Geography -Based on input from BRTs, each TRT must represent <br />interests from multiple basins, including east and west slope representation on each <br />roundtable. <br />^ Interest Group Roundtable Participants -Each TRT should include <br />representatives of a broad range of interest groups that were represented in SWSI. <br />In addition, TRT membership will be expanded to include specific expertise in the <br />roundtable topic. Representation should included: <br />- Water providers <br />- Water users <br />- Ranchers and farmers <br />- Recreational interests <br />- Business community <br />- Environmental interests <br />- Local government <br />- Technical experts in the specific topics, such as regulatory agency staff, <br />university or other researchers, water resource professionals, agronomists, and <br />`~ ~ <br />\\DENSVR01\SWSI\PHASE 2 WORK PLAN\SWSI PHASE 2 SOW 6-10-OS.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.