My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SWSI Phase 2 SOW_6-10-05
CWCB
>
SWSI II Technical Roundtables
>
DayForward
>
SWSI Phase 2 SOW_6-10-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 10:30:04 AM
Creation date
1/8/2008 3:27:18 PM
Metadata
Fields
Template:
SWSI II Technical Roundtables
Title
SWSI Phase 2 Scope of Work
Date
6/10/2005
SWSI II - Doc Type
Scope of Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SWSI Phase 2 Scope of Work <br />information provided by the TRTs and provide information on water planning needs. <br />This will be accomplished by performing the following tasks in association with the <br />BRT meetings on a basinwide basis: <br />^ Communicate project goals, methodology, and status <br />^ Identify sources of information for each TRT <br />^ Develop strategies for achieving objectives <br />^ Provide input on the assembly of supply options and strategies into alternatives <br />^ Develop a list of alternatives to meet water supply needs <br />^ Identify implementation needs/issues <br />^ Identify impacts associated with "No Action" for each basin <br />^ Evaluate the alternatives and recommend a path forward <br />Assumptions/Basis of Costs <br />^ Consultant will conduct an average of one BRT meeting within each river basin, for <br />a total of eight meetings. The number of BRT meetings may be redistributed <br />depending on the needs of the specific basin and to provide coordination with BRT <br />activities associated with HB 1177. <br />^ Each BRT meeting will last approximately 4 hours in duration. <br />^ Attendees at each meeting will include one to two members from the Consultant <br />team, a CWCB Board member, and a CWCB staff. <br />Summary of Deliverables <br />^ BRT meeting minutes <br />^ BRT PowerPoint presentations and meeting materials <br />^ Memorandum summarizing basin-specific resolutions associated with each TRT <br />with a focus on alternative development and evaluation of alternatives for each <br />individual basin. <br />Task 1.5 CWCB Meetings <br />Purpose <br />To involve the CWCB in the coordination and implementation of SWSI Phase 2. The <br />CWCB will provide a forum to facilitate interbasin discussions, as needed, and <br />address issues of statewide concern. These meeting will also provide a forum to <br />ensure efficient and effective coordination between TRT's and BRT's. CWCB will <br />also support the efforts of individual entities to resolve issues as they arise; however, <br />it is recognized that individual entities must ultimately work through their issues. <br />The CWCB will review and provide information from the TRTs, individual basins, <br />and provide input on the development of water supply strategies for achieving the <br />statewide objectives and on the development of alternatives. <br />`~ ~ <br />\\DENSVR01\SWSI\PHASE 2 WORK PLAN\SWSI PHASE 2 SOW 6-10-OS.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.