My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SJD_BRT_Mtg_2_Summary
CWCB
>
SWSI
>
DayForward
>
SJD_BRT_Mtg_2_Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2009 1:15:34 PM
Creation date
1/4/2008 10:10:07 AM
Metadata
Fields
Template:
SWSI
Basin
Southwest
Title
Meeting Summary 2
Date
2/10/2004
SWSI - Doc Type
Summaries
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Dolores/San Juan/San Miguel Basin Roundtable Technical Meeting #2 <br />Meeting Summary <br /> <br />. D21 - Tier 1, in permitting stage; M&I beneficiary would be P A WSD; estimated 1,500 AFY <br />yield would be used to enhance existing demands. <br />. D22 - this study resulted in the recommendation for the Dry Gulch project; as such it is <br />redundant and this option should be deleted from the list. <br />. D23 - essentially Tier 1; starting to permit it now, design is complete. <br />. It was noted that P A WSD's Stevens and Dutton projects will meet needs through 2010 to <br />2015; Dry Gulch would meet demands out until around 2030. <br />. D24 - Tier 3; it is being considered as a potential CWCB study. <br />. D25 - Tier 3, conceptual; there is some precedent for this type of project on the Cache la <br />Poudre River via the Colorado Water and Power Development Authority. <br />. A new interruptible supply option should be added to the list. <br />. D26 - Tier 3; first suggested in the CWCB instream flow conference in 2003, though it is not <br />currently on CWCB's potential study list now. <br />. D27 - Tier 1; parts of this project are underway, and some aspects need funding; this is more <br />of a "maintenance item" than a new source of supply. <br />. D37 - Tier 3. <br />. A new option (Tier 2) for consolidation or piping of Mancos ditches should be added to the <br />list of options; currently in planning stage. <br />. A participant noted that the planning process for a new Mancos Conservancy District is <br />underway, and that the Town of Mancos has a planning processes underway. <br />. D28 - This option is not viable unless there would be a significant reduction in the price of <br />electric power; this option should be deleted from the list as there is no current proponent. <br />. D29 - Tier 1, has been studied in depth; strictly for meeting CWCB instream flow. <br />. D30 - Tier 2; this project would provide a replacement source and some additional M&I <br />supply through about 2030; needs to go through water court. <br />. D31 - Ongoing process - programmatic approach to existing and new depletions. <br />. D32 - Tier 2; Agriculture and M&I beneficiaries; has some financing issues; may be an <br />alternative to Gurley Reservoir expansion/Lone Cone Reservoir. <br />. D33 - There are currently no proponents for this project; delete this option from list. <br />. New Tier 2 option for inclusion on the list: expansion of Gurley Reservoir by about 800 AF. <br />. New Tier 2 option for inclusion on the list: expansion Lone Cone Reservoir by about <br />4,000 AF. <br />. D34 - Tier 3. <br />. New option for inclusion on the list: Water Management Plan for San Miguel Water <br />Conservancy District. <br />. New option for inclusion on the list: Ed Joe Draw dam site for M&I purposes. <br />. New option for inclusion on the list: San Miguel pump station for Town of Norwood (M&I). <br />. It was noted that Tri-state's Nucla Plant will be needing additional supply, though <br />participants were unsure how to address this in the context of SWSI. <br />. D35 - this is a conceptual approach to removing a constraint. <br />. D36 - Tier 3. <br />. D38 - Portions of this project have been implemented; "Roundtail" is correct in catalog, not <br />"Roundtree"; this is an ongoing process and should be considered Tier 1. <br />. D39 - Conceptual, multi-beneficiary option; some ongoing examples. <br />. D41, 42, 43 - Tier 3; these options have all been studied and have multiple purposes. <br /> <br />CDIVI <br /> <br />7 <br /> <br />SJD BRT Mtg #2 Summary.doc 4/16/2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.