My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD11143
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD11143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:12:12 AM
Creation date
12/26/2007 3:37:05 PM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Arapahoe
Basin
South Platte
Title
Chatfield Reallocation Study: Meeting Minutes 11/17/2005
Date
11/17/2005
Prepared For
Meeting Participants
Prepared By
CWCB
Floodplain - Doc Type
Meeting Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Administration <br />Marty mentioned that the Corps is running low on funds and that this condition would be <br />corrected by the processing of the change order through the Colorado Water <br />Conservation Board of the funding from the 16 water interests. This will be given a high <br />priority and Tom Browning will be made aware of the need to proceed with timely <br />implementation of the change order. <br /> <br />Water Qualitv <br />Marty described that the next step in this process is to revise the Tetra Tech scope of <br />work to incorporate the recent consensus that was reached about the modeling approach. <br />Marty felt that he could revise that scope of work within the next day or two. <br /> <br />No Action Alternative <br />Joe Busto met on November 2 with representatives from Central Colorado Water <br />Conservancy District to assist them in submitting their memorandum about a no action <br />alternative. Central is the last entity that has not supplied the Tech Tech/Corps of <br />Engineer team with this analysis. <br /> <br />Recreational Study <br />Paul described the status of the study: that it includes 3 phases and that the first phase is <br />complete. The second and third phases include additional modeling and coordination <br />with Tom Keith ofEDAW. One decision that they are working on right now is the <br />preferred method for calculating evaporation. This analysis is on a schedule to be <br />completed by the end of the year. <br /> <br />That concluded the meeting. Please let me know of any questions. <br /> <br />Cc: Attendees <br />Tom Browning <br />Joe Busto <br />
The URL can be used to link to this page
Your browser does not support the video tag.