My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD11143
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD11143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:12:12 AM
Creation date
12/26/2007 3:37:05 PM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Arapahoe
Basin
South Platte
Title
Chatfield Reallocation Study: Meeting Minutes 11/17/2005
Date
11/17/2005
Prepared For
Meeting Participants
Prepared By
CWCB
Floodplain - Doc Type
Meeting Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />I'vlEMORANDUM <br /> <br />To: <br /> <br />Gene Weglinsky, Tetra Tech <br />Tom Browning, CWeB Flood Section Chief <br />Joe Busto, CWeB Flood Section <br />Tom Cech, Executive Director, Central Colorado \Vater Conservancy District <br />Tuesday, November 16,2005 <br />Chatfield No Action Alternative Comments <br /> <br />From: <br />Date: <br />Re: <br /> <br />Introduction <br />The primary focus of this document is to answer the question "What will CC\\1CD do if <br />Chatfield storage space is not made available'?" However, it is important to understand the <br />history and complexity of farming and inigation and its interface with urban water needs in <br />the South Platte River Basin and this is discussed as well. Unprecedented growth has led to a <br />series of discussions and contracts that \vill forever change land use in this basin. Senior water <br />rights will be purchased, reservoir $tomge space will be purchased and we will see pipelines <br />in the lower South Platte River to the Metro area. CC\VCD is trying to keep groundwater <br />\vells pumping and \ve act as a liaison between urban and rural interests. Projects like the <br />CWCB Statewide Water Supply lIlitiative have been a step in the right direction and eye <br />opening. However, there is no comprehensive state \vater plan and pressures from grmvth <br />will change \vater use in the South Platte River Basin. <br /> <br />CC'VCD Purpose <br />The primary services are to administer a Permanent Plan of Augmentation for approximately <br />1,000 irrigation wells, operate numerous groundwater recharge sites, surface and groundw'ater <br />quality research, water education activities, and revic\v of water rights applications in the <br />Division One Water Court. Augmentation is the replacement of river depletions caused by <br />out-oF-priority pumping of an alluvial well (a well that is hydraulically connected to the o o v..' <br />oCthe riv~r). A well user must acquire surface ,vater rights to offset \vell depletions. <br />CUITenLly, there are numerous court-decreed allgmentation plans, with Central's plan being <br />one 0 f the largest. Central has dil igently pursued water acquisition to: acquire a water <br />portfolio 0 f over $100 Jl1illion~ construct thousands of acre-teet of rcscrvoir storage projects; <br />recharge tens-of-thousands of acre-feet of surface water into thc South Platte alluvial Aquifer; <br />implement constmction of the largest pumping station in Central's history at La PQudre <br />Reservoir, and~ acquire large portable pumps to mitigate potential impacts of drought. The <br />re"ult has been continued pumping ohvells \vllile mitigating injury to senior \vater rights. [n <br />the South PIaUe River Basin there are approximately 10,000 alluvial wells, \vh ich 5,000 are <br />irrigation wells. CC\VCD provides out of priority replacements for about 1000 of these <br />alluvial wells. <br /> <br />Benefits from Chatfield Storngc Space <br />· Increa~ed storage of Chatfield prolongs agriculture and saves ditch water by enabling <br />ground water pumping to continue, <br />· If Central is able to get Chatfield space, it would increase the amount of ground water <br />our members could pump. <br />· This storage space \vill allow pumping to increase from 50%J to 60% of historic levels. <br />
The URL can be used to link to this page
Your browser does not support the video tag.