Laserfiche WebLink
<br />d. Provide model input data sets and outputs on a web based server for <br />access by BRT and others. <br /> <br />Deliverable <br />: Task memorandum describing s cenarios formulated to demonstrate <br />Phase I act ivities, summary of outputs from water availability results from <br />simulations, and provisio n of model inputs and outputs for scenarios on web <br />based server. <br /> <br /> <br />10. Phase I Reporting – document activities and results of Phase I <br /> <br />a. Draft R eport – prepare a draft report summarizing the methods, <br />assumptions and results of Phase I activities. Provide to BRT/IBCC and <br />CWCB staff for review/comment. <br /> <br />b. Workshop – Prepare for and participate in workshop for BRT members <br />and others to share Phase I methods, assumptions and results of Phase I <br />activities. <br /> <br />c. Final Phase I Report - Finalize Phase I report considering comments of <br />BRT/IBCC and CWCB. <br /> <br />Deliverable <br />: Draft and Final Phase I Report. Written pres en tat i on material for <br />workshop as well as written summary of workshop outcome. <br /> <br /> <br />P HASE I S CHEDULE <br /> <br />Primary components of the s chedule for the Phase I Study include scope refinement , <br />contractor procurement and technical activities. A schedule of estimated important <br />milestones for the Phase I Study is given below. <br /> <br /> Component Complet ion Month <br />Phase I Scoping Refinement – Task 1 w/IBCC September 2007 <br /> w/BRT November 2007 <br />Ph ase I Contractor Procurement /Initiation of <br /> Technical Activities March 2008 <br />Phase I Modeling Review Workshops (3) March 2008 - June 2009 <br />Phase I Compl etion of Technical Activities June 2009 <br /> <br /> <br />Colorado River Water Availability Study Scope 15 October 1 9 , 2007 <br />