My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10396
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD10396
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:13:32 AM
Creation date
11/5/2007 3:57:37 PM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
33
County
Boulder
Community
Boulder
Stream Name
South Boulder Creek
Basin
South Platte
Title
Major Drainageway Planning - South Boulder Creek - Volume 1
Date
12/1/1973
Designation Date
6/21/1974
Prepared For
Boulder, UDFCD
Prepared By
R.W. Beck and Associates
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1-2 <br /> <br /> <br />a. Natural channel. <br />b. Major underground conduit. <br />c. Relocate channel thalweg. <br />d. Lined flood channel. <br />e. Combination of the above. <br /> <br />6. Obtain legal opinion for each alternative. <br /> <br />7. Evaluate the environmental impact of each alternative. <br /> <br />The scope of services for Phase B includes the following items: <br /> <br />1. Perform final hydrological studies to determine the magnitude <br />and volume of flood runoff to be used for design purposes. <br />This information shall be presented in hydrograph form. <br /> <br />2. <br /> <br />Design Criteria shall be developed specifically for the sub- <br />ject project which will be compatible with the Urban Drainage <br />and Flood Control drainage criteria to permit obtaining of <br />Federal aid should such Federal aid be available and <br />desirable. <br /> <br />~ <br /> <br />3. The final mapping showing plan and profile will be pre- <br />pared at a scale of I-inch to 100 feet and with a contour in- <br />terval of 2 feet and will be shown on 24-inch by 36 -inch mylar. <br /> <br />4. The approximate channel requirements will be outlined on <br />the map. <br /> <br />5. A plan and profile will be prepared for all the Basin channel <br />and flood plain in order to show right-of-way widths required, <br />approximate thalweg elevations at all street cros sings, <br />and approximate water surface elevations for the design <br />flood. <br /> <br />6. The Preliminary Design drawings (1) shall be prepared on <br />24" x 36" sheets accompanied by a written report presenting <br />the hydrological data, design criteria, narrative description <br />of the Preliminary Design (2), together with estimated costs <br />of the works at present-day prices. Costs shall not include <br />right-of-way. <br /> <br />. <br /> <br />(I) Referred to herein as Volume II. <br />(2) Referred to herein as Volume I. <br />
The URL can be used to link to this page
Your browser does not support the video tag.