My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10499
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD10499
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:13:27 AM
Creation date
10/30/2007 10:42:24 AM
Metadata
Fields
Template:
Floodplain Documents
County
Fremont
Community
Canon City
Stream Name
Fourmile Creek
Basin
Arkansas
Title
Canon City / Fourmile Creek Documents
Floodplain - Doc Type
Correspondence
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />AUG 19 '98 02:23PM URBAN DRAINAGE <br /> <br />... <br /> <br />project that may result during reviews by FEMA or other outside agencies. <br />DISTRICT shall have 30 days to review the draft. ENGINEER shall have 30 days to <br />make any necessary chanses and del~'er the final reports to D1STRICT. During t.he <br />course of the work, ENGINEER shall be a,,'ailable at the request of the D1STRICT, <br />to confer with officials who need specific flood channel or floodplain information <br />related to particular street crossings, utility crossings, or for subdiYisions up for <br />approval which might be affected by new tloodpl.!in information developed illl the <br />course of this study. Additional requirementS requested above and over thos<~ <br />identified in this Agrcement shall be negotiated at the time they are identified, <br />6. METHOD OF REVIEW1NG PERFORMANCE <br />A. ENGINEER shall submit the work called for in Paragraph B to DISTRICT for <br />written approval by DISTRICTs Executive Director or his designee. In cases <br />where no written approval is required bcrelmder, ENGINEER shall furnish <br />DISTRICT with written statements concerning work accomplished at the <br />appropriate times. DISTRICT will provide approval or tbe reasons for the lack <br />thereof within fifteen (IS) calendar days afier each such submittal. <br />B. ENGINEER shall provide an up-to-date progress cbart on no less than a <br />montbly basis. Inilial chart to be provided '[0 DISTRICT for approvals within <br />ten (lO) days of notice to proceed, <br />7. p.~mQli.OEAGREEMENT EFFORT AND COORDINATION <br />A. Notwithstanding any of the provisions of this Agreement, the Executivl: <br />Director of DISTRICT shall be the only individual authorized to rediroct the <br />etroll or in any way amend or modify the tclmlS of this Agreement. <br />B: DISTRICT may appoint a Project Director who shall represent the EXE:cutive <br />Director in the technical phases oftbe work. <br />C. ENGINEER will appoint a Project ManagE!r who shall direct ENGINEER's <br />work under this Agreement. <br />D. DISTRICT shall be responsible for coordinating infOI"m8tion with local entities <br />during the performance of'tbis Agreement. In the event that the Executive <br />Director is not available, a duly authorized person shall be appointed tc, assume <br />the responsibilities of the Executive Oircct()r pertaining to this Asreemlent. <br />8, COMPENSATION <br />DISTRICT agrees to pay ENGINEER Sixty Sevlen Thousand Eight Hundred <br />Seventeen Dollars ($67,817) for the above services. The costs to be assigned to each <br />portion of the Scope of Services, in order that DISTRICT may contract for cn))' <br />specific portions of the Scope of Services. are as follows: <br />~ Cost Item ~ <br />B.l. $ 5,166 B.8. -0- <br />B.2. 429 B,9. 16,504 <br />B.3. -0- B,lO. 3,520 <br />B.4. 17,252 B.I1. 1,179 <br />B.S. 10,379 8.12. 1,760 <br />8.6. 3,524 a.13. 8,104 <br />8.7. -0- <br />TOTAL: $67,817 <br />9. METHOD OF PaYMENT <br />The ENGINEER shall receive monthly partial pa:J'ftIents for work completed in the <br />preceding pa)' period based on a percentase of the amount of work completed at the <br />time ofbiIJing referenced to the above numbered tasks and mutually agreed upon by <br /> <br />UJoodIApamn\\971203 <br /> <br />s <br /> <br />P.5/8 <br /> <br />ro <br />
The URL can be used to link to this page
Your browser does not support the video tag.