Laserfiche WebLink
<br />- . <br /> <br /> FEDERAL EMERGENCY MANAGEMENT AGENCY 1. COMMUNITY 10. NO. SUB SEQ 2. CONTRACTOR CODE <br /> BASELINE PLAN 80070 CONTRACTOR SYMBOL <br />3. CONTRACT NUMBER 4. TRANSACTION CODES U 5. WRC HYDROLOGIC UNIT CODE STREAM MILES COASTAL MI <br /> Interagency Agreement No. <br /> DORIGINAL BASELINE [KlREVISED BASELINE 11020002 2 N/A <br />6. COMMUNITY (Name, County, State) 7. CONTRACTOR OFFICIAL PREPARING PLAN (Please Print) 9, CONTRACTOR (Name, Address, Phone)(Please Print) <br />CITY OF FLORENCE COAL CREEK JOAN E. LOTOSKY CESPA-EC-EH U.S. ARMY ENGINEER DISTRICT, ALBUQUERQUE <br />FREMONT COUNTY 8. SIGNATURE DATE 4101 JEFFESON PLAZA NE. ALBUQUERQUE, NEW MEXICO 87109 <br />COLORADO 23-Dec-02 PHONE: (505) 342-3323 <br />10, MAILING CODE 11, PO NAME OATE BASELINE <br /> RECEIVEO <br /> (Please Print) (Signature) FEMA APPROVAL (PO) <br />12. 13. Month Elaosed 112T3 4 15 16 17 T8 19 110111112113M4T15 16M7T18119120121122 123 124 125 1?6 127 12, 16. Planned 17. <br />Task Task! 14, Calendar Yrs, 2001 2002 2003 Task Completion Percent <br />Ident Activity 15. Calendar Mos. 0 N 0 J F M A M J J A S 0 N 0 J F MA M J J A S o N 0 Ident Date Cost Completion <br />No. List No. <br />2 CONDUCT RECONNAISSANCE '- 2 <br /> BIBLIOGRAPHIC SEARCH 5/1/2002 $2,687 0 <br />3 PREPARE APPROXIMATE 3 <br /> FLOOD BOUNDARY <br />4 CONDUCT AERIAL SURVEY 4 <br />5 CONDUCT LAND SURVEY - ( C P 1 ) 5 <br /> 8/1/2002 $3,872 0 <br />6 PERFORM HYDROLOGY ""'" ( C P 2 ) 6 <br /> 6/1/2002 $601 0 <br />7 PERFORM HYDRAULICS - i- - - ( C P 3 ) 7 <br /> 4/1/2003 $15,276 0 <br />8 CONDUCT VERIFICATION I- 8 <br /> OF PROFILES 5/1/2003 $1,768 0 <br />9 ACCUMULATE MAP MATERIALS 9 <br /> 7/1/2002 $3,465 0 <br />10 PREPARE WORK MAPS ( C P 4 ) 10 <br /> FOR FIRM 6/1/2003 $3,907 0 <br />11 PREPARE FLOOD ELEVATION ""'" 11 <br /> STUDY REPORT 7/1/2003 $4,721 0 <br />12 SUBMIT DRAFT OF FLOOD 12 <br /> ELEVATION STUDY REPORT ( C P 5 ) 7/1/2003 $13,403 <br /> TO PO AND TEC \I <br /> ESTIMATED 18. <br />FOR REVISED BASELINE PLAN: 00 CHANGE IN TIME 0 CHANGE IN COST TOTAL COST: $49,700 <br /> <br />QUARTERL Y STA TUS REPORT <br /> <br />Period Covered' <br /> <br />