Laserfiche WebLink
<br />, <br />. <br /> <br />I. <br /> <br />Four Seasons Trout Farm <br />March 22, 2002 <br /> <br />Page 2 <br /> <br />3, An approved contract must be in place before funds can be advanced, Jan IIlian has placed <br />this project on our contracting "hot Iisf' and has initiated the loan contracting process, Our goal <br />is to have the loan contract ready for final signature and routing by July 1, 2002, <br /> <br />4, You must adhere to the CWCB Desiqn and Construction Administration Procedures, Tim <br />Feehan will contacted you regarding the CWCB requirements concerning project bidding, <br />design, and construction. Tim will make construction inspections, which will be the basis of the <br />pay estimates for disbursement of your loan funds, <br /> <br />On behalf of the Board, I would like to thank you lor applying for a Small Project Loan from the <br />Colorado Water Conservation Board, <br /> <br /> <br />~~ <br /> <br />Attachments: <br /> <br />Updated Memo: FourSeasonsTrout302memo <br /> <br />cc (w/Attachment): <br /> <br />Mr. Keith Catlin, Board Member, Colorado Water Conservation Board <br />Ed Frazar, Colorado Division of Wildlife, 6060 Broadway Denver, CO 80216 <br />CWCB Section B Staff <br />Linda Bassi, AGO <br />Chrono File <br /> <br />c: wp51\Proj-New\FourSeasonsTrout 302ltr <br />