My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC00177 (2)
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
PROJC00177 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:27 AM
Creation date
9/14/2007 3:23:59 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150110
Contractor Name
Four Seasons Trout Farm
Contract Type
Loan
Water District
40
County
Delta
Bill Number
HB 02-1152
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br />, <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Shennan Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866,3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />March 22, 2002 <br /> <br />Bill Owens <br />Governor <br /> <br />GregE, Walcher <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Mr. John Niblack <br />Four Seasons Trout Farm <br />P,O, Box 21 <br />Cedaredge, CO 81413 <br /> <br />RE: Fish Hatchery Rehabilitation <br />Small Project Loan Approval <br /> <br />Dear Mr, Niblack, <br /> <br />I am pleased to inform you that the Colorado Water Conservation Board (CWCB) approved your <br />Small Project Loan request on March 21, 2002, The loan is for rehabilitation work at the Four <br />Seasons Trout Farm Fish Hatchery, <br /> <br />The Board approved a Small Project Loan from the Construction Fund in a maximum amount of <br />$85,500, The loan terms are 2,25% for 10 years, The Board also approved a grant in amount of <br />$1,435 to pay for half the cost of the engineering necessary to complete the feasibility study, I have <br />attached a copy of the updated Board memo concerning the Four Seasons Trout Farm, Please <br />refer to page 5 of that memo and to the section "Action taken by the CWCB March 21, 2002." <br /> <br />When the Board approved this Small Project Loan it attached several conditions: <br /> <br />1, Approval of vour loan is continqent upon passaqe of the Construction Fund Bill (HB 02- <br />1152), to allow the CWCB to authorize loans for fish hatchery rehabilitation projects without <br />legislative approval. The Bill shouid be signed and its conditions in effect by July 1,2002, <br /> <br />2, A Feasibility Studv is required, John Van Sciver has drafted the study titled "Feasibility of <br />Rehabilitation of the Four Seasons Trout Farm Fish Hatchery," The final report will meet the <br />requirements of the CWCB Construction Fund Guidelines for feasibility studies, <br />
The URL can be used to link to this page
Your browser does not support the video tag.