My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Metro - ECCV Zero Liquid Discharge Pilot Study_Application
CWCB
>
WSRF Grant & Loan Information
>
Backfile
>
Metro - ECCV Zero Liquid Discharge Pilot Study_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2012 12:49:38 PM
Creation date
9/14/2007 1:09:43 PM
Metadata
Fields
Template:
WSRF Grant Information
Basin Roundtable
Metro
Applicant
East Cherry Creek Valley Water and Sanitation District
Description
Zero Liquid Discharge Pilot Study
Account Source
Basin & Statewide
Board Meeting Date
9/19/2007
Contract/PO #
150412
WSRF - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Section 2 <br /> <br />Personnel <br /> <br />product Inaterials for reuse. He will be working specifically with the process <br />configuration, pilot plant start/up, and the data analysis for this project. He is <br />skilledcl with the development and testing of high recovery RO processes for <br />treatment of oil and gas field produced water. Some of ~h. Kimball's project <br />experience includes installation of Zero/ Liquid Discharge Process at Lead <br />Smelter in East Helena, Montana; Conceptual Design of High Recovery RO <br />Treatment System for New Mexico DOT; and the Evaluation of RO Pretreatment <br />Options for the City of Hutchinson, Kansas. <br /> <br />Ken Klinko, P.E. - RO Technical Specialist <br /> <br />\Vith 25 years experience in water purification utilizing RO, ultrafiltration, and <br />microfiltration membrane processes, Mr. Klinko will specifically be working on <br />the process configuration and data analysis for this project. In the past, Mr. <br />Klinko has participated in many pilot studies developing the Florida brackish <br />RO and nanofiltration market. Currently existing systems for which he was <br />involved in the initial membrane process piloting and design include the City of <br />Venice, Florida (brackish RO membrane system retrofit); Town of Jupiter, <br />FlOlida (brackish RO membrcme pilot plant); City of Plantation, Florida <br />(nanofilter membrane pilot plant and system); Dare County, North Carolina <br />(brackish RO membrane pilot and system); City of Ft. ;vlyers, Florida (nanofilter <br />membrane pilot plant and system); and Palm Beach County (nanofilter <br />membrane pilot plant). <br /> <br />John Robinson, P.E. - Instrumentation System Design and SCADA <br />Integration <br /> <br />For the past 25 years, Mr. Robinson has developed and implemented <br />instrumentation and control systems for automated processes \Vith 18 years <br />experience, he has specialized in water and wastewater projects, and acted as <br />the lead instrumentation and controls engineer for the Mariposa and Cabezon, <br />New Mexico membrane bioreactor (MBR) design/builcl project. Mr Robinson <br />also participated in the 60 percent conceptual design for a Reverse Osmosis <br />plant supporting the ECCV Northern \Vater Supply facilities. His experience <br />also includes project justification, project management, project engineering, pilot <br />plant operations, application programming, field startup, general <br />trou bleshooting, and operator training. <br /> <br />Dave Campbell - Construction Coordinator <br /> <br />Mr. Campbell is a CDM Construction Branch Manager/ Project Team Manager <br />with over 18 years of experience in all phases of heavy and industrial <br />construction work He is highly adept at overall construction planning and <br />organization. Mr. Campbell served as project superintendent for construction of <br />a new reverse osmosis \VTP for the City of Brighton, Colorado. He was <br />responsible for construction site related matters including safety, quality <br />control, survey/layout, CPM scheduling, supervision of company personnel, <br />material procurement, weekly labor reports, monthly job cost report, and <br />subcontract coordination/administration. <br /> <br />2-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.