Laserfiche WebLink
<br />O <1\~ ~ ... n <br />Ull)J~ <br /> <br />Pebruary 27, 1998 <br /> <br />11.17 Draft Colorado River Model Documentation <br /> <br />Primary Responsibility: Boyle <br /> <br />In this subtask, the existing StateMod documentation for the Colorado River model will be <br />revised to reflect the extended data set development. Chapter 5 tables will be revised to <br />cover 1975-1996. Significant changes to calibration under Task 11.12 will be described in <br />that section. Approach to development of the extended data set will be covered in an <br />appendix consisting ofthe task memos from Tasks 11.4,11.5, 11.7, 11.9, 11.10, and 11.12, <br />formatted appropriately. Results of the simulation with the extended data sets will be <br />presented in a new Chapter 6. Graphs of representative gages and reservoirs for 1929-1996 <br />will be included in this section. <br /> <br />Subsections of Chapter 4 related to the reservoir end-of-month content file, historical <br />diversions file, and historical demand file, will be updated. Appropriate revisions to the <br />executive summary will also be made. Sections of Appendix C describing gage filling <br />techniques used in Phase II will be removed. This task will not include reorganizing or <br />rewriting text related to the Phase ilia model. <br /> <br />Deliverables: <br /> <br />· 2 hard copies of the Draft Engineering Report for the Colorado River Model <br /> <br />11.18 Final Colorado River Model Documentation <br /> <br />Primary Responsibility: Boyle <br /> <br />Boyle will incorporate State comments into the final Engineering Report for the Colorado <br />River model. Word files will be provided to the State or another contractor for inclusion in <br />the on-line documentation. <br /> <br />Deliverables: <br /> <br />· Pinal Engineering Report for the Colorado River Model, 5 copies and Word file copy <br /> <br />11.19 Draft Yampa River Model Documentation <br /> <br />Task 11.18 will be repeated for the Yampa River model <br /> <br />Deliverables: <br /> <br />· 2 hard copies of the Draft Engineering Report for the Colorado River Model <br /> <br />11.20 Final Yampa River Model Documentation <br /> <br />Task 11.19 will be repeated for the Yampa River model <br /> <br />Deliverables: <br /> <br />· Pinal Engineering Report for the Yampa River Model, 5 copies and Word file copy <br /> <br />11.21Draft San Juan River Model Documentation <br /> <br />Task 11.17 will be repeated for the San Juan River model <br /> <br />Deliverables: <br /> <br />· 2 hard copies of the Draft Engineering Report for the San Juan River Model <br /> <br />10 <br />