My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12556
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSPC12556
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:16:50 PM
Creation date
8/6/2007 8:12:27 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Computer Models - Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
2/27/1998
Author
Unknown
Title
CRDSS Project Schedule Gantt Chart and Schedule Background Information Report with staff comments- RE-CRDSS - 02-27-98
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OtJIGJ8 <br /> <br />February 27, 1998 <br /> <br />11.14 San Juan River Model Simulations <br /> <br />Primary Responsibility: Boyle <br /> <br />Task 11.12 will be repeated, but for the San Juan model. <br /> <br />Deliverables: <br /> <br />· complete historical data set for the extended period 1929-1996 for the San Juan River <br />basin <br />· complete calculated data set for the extended period 1929-1996 for the San Juan River <br />basin <br />· midpoint recommendation to continue or not continue calibration <br />· complete baseline data sets for 1929-1996 for San Juan River basin <br />· draft and final task memoranda <br /> <br />11.15 Gunnison River Model Simulations <br /> <br />Primary Responsibility: Boyle <br /> <br />Task 11.12 will be repeated, but for the Gunnison model. <br /> <br />Deliverables: <br /> <br />· complete historical data set for the extended period 1929-1996 for the Gunnison River <br />basin <br />· complete calculated data set for the extended period 1929-1996 for the Gunnison River <br />basin <br />· midpoint recommendation to continue or not continue calibration <br />· complete baseline data sets for 1929-1996 for Gunnison River basin <br />· draft and final task memoranda <br /> <br />11.16 White River Model Simulations <br /> <br />Primary Responsibility: Boyle <br /> <br />Task 11.12 will be repeated, but for the White River model. Note that the approach to the <br />demands for the aggregated structures has changed and will require extra work relative to that <br />effort for other basins. <br /> <br />Deliverables: <br /> <br />· complete historical data set for the extended period 1929-1996 for the White River basin <br />· complete calculated data set for the extended period 1929-1996 for the White River basin <br />· midpoint recommendation to continue or not continue calibration <br />· complete baseline data sets for 1929-1996 for White River basin <br />· draft and final task memoranda <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.