Laserfiche WebLink
<br />February 27, 1998 <br /> <br />001310 <br /> <br />11.22 Final San Juan River Model Documentation <br />Task 11.18 will be repeated for the San Juan River model <br />Deliverables: <br />· Final Engineering Report for the San Juan River Model, 5 copies and Word file copy <br />11.23 Draft Gunnison River Model Documentation <br />Task 11.17 will be repeated for the Gunnison River model <br />Deliverables: <br />· 2 hard copies of the Draft Engineering Report for the Gunnison River Model <br />11.24 Final Gunnison River Model Documentation <br />Task 11.18 will be repeated for the Gunnison River model <br />Deliverables: <br />· Final Engineering Report for the Gunnison River Model, 5 copies and Word file copy <br />11.25 Draft White River Model Documentation <br />Task 11.17 will be repeated for the White River model <br />Deliverables: <br />· 2 hard copies of the Draft Engineering Report for the White River Model <br />11.26 Final White River Model Documentation <br />Task 11.18 will be repeated for the White River model <br />Deliverables: <br />· Final Engineering Report for the White River Model, 5 copies and Word file copy <br /> <br />11.27 Ayres Support of Others' Tasks <br /> <br />This subtask is created to allow Ayres to provide technical support to Boyle, the State, and <br />other contractors in completion of their tasks. Technical support is budgeted through this <br />task to facilitate invoicing the first 26 tasks. The following guidelines describe approximate, <br />anticipated distribution of budget for this task: <br /> <br /> Percent of Stibtask 11.27 <br />Tasks bud2et <br />11.1-11.4 Data prep 15 <br />11.6, 11.8 Software enhancement 5 <br />11.9 Preliminary Baseflows 25 <br />11.11-11.16 Simulations 30 <br />11.17 -11.26 Documentation 25 <br />Total 100 <br /> <br />11 <br />