Laserfiche WebLink
<br />CWCB Water Conservation Planning Grant Application <br /> <br />City of Rifle <br /> <br />project budget constraints, these are expected to be rough approximations. <br />[Consultant/City staff) I <br />o Calculating approximate cost per gallon of water saved for each <br />program/measure on both a peak capacity and annuallaverage volume basis. <br />[Consultant) <br />o Developing consensus selection criteria and scoring system. [Consultant/City <br />staff) <br />o Ranking/prioritizing the list based on costs per gallon saved and scoring for <br />other selection criteria. [Consultant) <br />Actual selection of final conservation measures and programs depends upon the <br />integration of the above work with the 2006 Water Mastel,. Plan projections and <br />will occur in Task 05 (Step #7). <br /> <br />f. <br /> <br />Task 05: Integrate Resources. Modify Forecasts. and Select Measures and <br />Programs (Planning Step #7) <br />[Task responsibility: 25% City staff /75% Consultant) <br />Final program/measure selection will be made based on the potential for the <br />highest-ranked measures and programs to lower the overall cost of water. As <br />noted in Task 01, a modified version the financial spreadsfteet developed for the <br />I <br />2006 Water Master Plan will be used for this purpose. Cumulative effects of <br />I <br />measures and programs will be evaluated starting with the highest-ranked option <br />and adding options sequentially. For each combination 6f measures/programs <br />evaluated, demands will be re-forecasted, capital p~ojects re-defined/re- <br />scheduled, and total cost of service financial projections re-cast. We envision <br />that the estimated water savings associated with the consetvation programs and <br />measures identified at the point of diminishing cost-saving~ returns will be a key <br />I <br />determinant of the overall water conservation goal for the City. <br /> <br />A final activity performed as part of this task will be to meel with City Council to <br />present the conservation programs and measures proposed ahd the background of <br />the proposal. Feedback will be solicited and revisions madelas appropriate. <br /> <br />g. Task 06: Develop Conservation Program Implementation Plan (Plan Step #8) <br />[Task responsibility: 30% City staff / 70% Consultant) I <br />For each of the selected conservation programs/measures to be implemented by <br />the City, the following will be determined: I <br />o Key steps required for successful implementation. [Cfonsultant/City staff) <br />o Key external factors or contingencies that might affect implementation. <br />[Consultant/City staff) I <br />o Annual budget allocations required. [Consultant/City staff) <br />o Individual(s) responsible for leading the implemehtation phase. [City <br />stajJIConsultant) I <br />o Key community partners to involve in itpplementation and <br />expected/needed level of involvement [Consultant/City staff} <br />Permits/approvals required. [Consultant) I <br />Legislative action needed. [Consultant/City staff) <br />Key metrics, milestones, and monitoring activities for tracking <br />performance. [Consultant) <br /> <br />o <br />o <br />o <br /> <br />A plan and schedule for conservation plan updates will also be developed. <br />[Consultant/City staff) <br /> <br />SGM # 99055A-387 <br /> <br />2-10 <br /> <br />Section 2.0 - Required qrant Application Info. <br />