My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rifle WCPlan ApprovalLtr
CWCB
>
Water Efficiency Grants
>
Day Forward
>
Rifle WCPlan ApprovalLtr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2011 9:32:44 AM
Creation date
8/3/2007 3:42:07 PM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Planning Grant
Contract/PO #
OE PDA 08-17
Applicant
City of Rifle
Project Name
City of Rifle Water Conservation Plan
Title
Grant Application for City of Rifle
Date
7/19/2007
County
Garfield
Water Efficiency - Doc Type
Approval Letter
Document Relationships
Rifle_WCPlan2008
(Message)
Path:
\Water Conservation\DayForward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Water Conservation Planning Grant Application <br /> <br />City of Rifle <br /> <br />h. Task 07: Produce Conservation Plan Document and Solicit Public Input <br />[Task responsibility: 25% City staff /75% Consultant] <br />Under this task, a draft Water Conservation Plan report will be produced. The <br />City will advertise and host an open-house to present the draft document, post the <br />draft document on the City's website, and public comments will be re(:eived for a <br />60-day period. The project team will consider the comments and finalize the <br />document prior to submission to CWCB. <br /> <br />1. Task 08: Proiect Management <br />[Task responsibility: 30% City staff / 70% Consultant] <br />This project will involve coordination between City staff, its consultant team, and <br />CWCB. The consultant team will be providing regular email progress updates to <br />City staff and written progress reports to CWCB at the 50% and 95% completion <br />marks. Monthly project progress meetings will be organized by the: consultant <br />and held at City Hall. It will also be managing its budget portion and invoicing <br />to the City. City staff will be participating in meetings, reviewing and <br />commenting on project progress updates and managing disbursements to the <br />Consultant and receipt of grant monies. <br /> <br />A preliminary schedule for Tasks 01 through 08, also showing dates for progress reports <br />and final plan submission to CWCB is included in Attachment A. Actual dates for task <br />completion and status report milestones will change based on project start date, which is <br />a function of grant release timing. <br /> <br />2.7 Water Conservation Plan Development Project Budget <br /> <br />Table 7 shows the task-by-task budget with consultant team costs and City in-kind <br />contributions. The bottom of the table also shows the anticipated funding source <br />breakdown. Attachment B contains the man-hour estimates for both the consultant team <br />and the City that went into producing Table 7. <br /> <br />2-11 <br /> <br />Section 2.0 - Required Grant Application Info. <br /> <br />SGM # 99055A-387 <br />
The URL can be used to link to this page
Your browser does not support the video tag.