My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12597
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP12597
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:16:43 PM
Creation date
8/2/2007 8:45:43 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
7630.650
Description
Wild and Scenic - Yampa River
State
CO
Basin
Yampa/White
Water Division
6
Date
3/1/1990
Author
Unknown
Title
Yampa River Basin Study 1988-1991 - Multiple Rough Drafts of Scope of Work - With Study Schedule - 03-15-90 through 07-09-90
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />003203 <br /> <br />TASK 6--RECOMMENDED PLAN <br /> <br />This task will descnbe, in more detail, the recommendations for the final altemative( s). <br />Information will be provided that allows the TSC to understand the technical, eco- <br />nomic, and environmental issues, as well as water availability and supply benefits and <br />impacts, associated with the recommended plan. <br /> <br />This task will include the following activities: <br /> <br />. Task 6.A--Recommended Plan <br />. Task 6.B--Hydroelectric Potential <br />. Task 6.C--Environmental Impacts Analysis <br />. Task 6.D--Recreational Impacts and Benefits <br />. Task 6.E-- Layouts and Cost Estimates <br />. Task 6.F--Economic Considerations <br />. Task 6.G--Financial Assessment <br />. Task 6.H--Public Advisory Group Presentation <br /> <br />TASK 6.A--RECOMMENDED PLAN <br /> <br />Purpose <br /> <br />The study team will descnbe the physical and operational aspects of the project plan <br />that appears to best meet the study objectives. An appraisal level description of the <br />layout of dams and reservoirs, and related physical features will be described. <br /> <br />Responsibility <br /> <br />"CH2M HILL will be responsible for this task. <br /> <br />Approach <br /> <br />The study team will undertake the following activities: <br /> <br />1. Describe the recommended conceptual plan according to location, dam type, <br />reservoir characteristics (including inundated area, storage elevation curves) and <br />related physical features. <br /> <br />2. Describe the hydrologic operatim! characteristics of each reservoir. Yield analv- <br />., -. - ., <br />ses and storable flows will be established for the recommended plan assuming <br />the priority date of the Juniper-Cross Mountain decrees. LRCWE will conduct <br />this subtask. <br /> <br />28 <br /> <br />DENI800P/033.51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.