Laserfiche WebLink
<br />003198 <br /> <br />alternative concepts will be developed in Tasks 5.E, 5.F, and 5.G, and will lead to the <br />recommended plan (Task 5.H). <br /> <br />Responsibility <br /> <br />CH2M HILL will be responsible for this activity. <br /> <br />Approach <br /> <br />The study team will undertake the following activities: <br /> <br />1. Describe three alternative concepts incorporating the five preferred reservoir <br />sites (Task 5.D) and reasonable operational modes identified by the project <br />team and TSC members. <br /> <br />2. Establish technical/physical facilities for each of the three alternative concepts. <br /> <br />3. Using cost information developed in Task S.C, develop a construction cost for <br />each of the three alternative concepts. <br /> <br />4. Prepare a technical memorandum descnbing the three alternative concepts to be <br />used as a datum for hydrologic analyses (Task 5.F) and an environmental review <br />(Task 5.G). <br /> <br />Product <br /> <br />1. Up to three conceptual projects will be described in a technical memorandum. <br /> <br />TASK 5.F--CONCEPTUAL PROJECT <br />HYDROLOGIC ANALYSES <br /> <br />Purpose <br /> <br />The study team will evaluate the level to which operation of the three alternative con- <br />ceptual projects meet the municipal, industrial, and irrigation demands and instream <br />flow objectives of the study. <br /> <br />Responsibility <br /> <br />LRCWE will be responsible for this activity. <br /> <br />?" <br />-~ <br /> <br />DENI800P/033.51 <br />