Laserfiche WebLink
<br />. <br /> <br />003196 <br /> <br />required to develop each reservoir site. These will include dam type and size, spillway <br />type and size, outlet type and size, and other major cost items such as highway, rail- <br />road, or pipeline relocations. <br /> <br />Responsibility <br /> <br />CH2M HILL will be responsible for this task. <br /> <br />Approach <br /> <br />1. Develop applicable unit prices for various construction elements such as earth- <br />fill, rockfill, concrete, fabricated metal work and castings, and similar items. <br />These costs will be based on cost curves, cost estimating guides, available public <br />domain information, and data from CH2M HILL experience and cost files. <br /> <br />2. In conjunction with the CRWCD, develop approximate land acquisition cost <br />estimates. <br /> <br />3. Based on the results of previous tasks, identify the type and size of major proj- <br />ect components, such as dam type, spillway type, outlet type, (as well as acqui- <br />sition area and other site-specific major cost items, such as relocations and envi- <br />ronmental impact mitigation). <br /> <br />4. Tabulate prereconnaissance level quantities of work required for each alterna- <br />tive using USGS topographic maps and conceptual layouts of facilities. <br /> <br />5. Based on the tabulated quantities and the developed unit prices, develop opin- <br />ions of the construction cost for each of the 10 alternative reservoir sites. <br />Special construction that may be unique to a site will be estimated separately <br />and included in the site total construction site. <br /> <br />6. Add appropriate allowances to the estimate for each alternative to provide for <br />construction-related costs such as engineering, administration, and similar items. <br /> <br />7. The results of the cost estimates will be tabulated in a form to allow comparison <br />of the alternatives. <br /> <br />Products <br /> <br />1. A task memorandum summarizing the development of unit prices and tabulating <br />the estimated quantities and costs for each of the 10 alternative reservoir sites <br />will be prepared and used as input to the project element screening task ~ <br />(Task S.D). <br /> <br />21 <br /> <br />D ENI800P 1033.51 <br />