My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12597
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP12597
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:16:43 PM
Creation date
8/2/2007 8:45:43 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
7630.650
Description
Wild and Scenic - Yampa River
State
CO
Basin
Yampa/White
Water Division
6
Date
3/1/1990
Author
Unknown
Title
Yampa River Basin Study 1988-1991 - Multiple Rough Drafts of Scope of Work - With Study Schedule - 03-15-90 through 07-09-90
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Plan of Study <br /> <br />003167 <br /> <br />70 <br /> <br />TASK 10 <br />PROJECT DEVELOPMENT PLAN <br /> <br />Overview <br /> <br />The primary objective of this task is to prepare a development plan for the near-term <br />component of the recommended project. A secondary objective is to define a framework for <br />diligence and initiation of planning for the long-term component of the recommended <br />project. <br /> <br />The development plan for the near-term component will provide a concise summary of the <br />additional technical investigations, permitting and licensing, project integration with the <br />Recovery Program, water rights transfer proceedings, financing arrangements, and <br />supporting public involvement programs needed to implement the near-term project. The <br />plan will also include a preliminary schedule for these activities. <br /> <br />This task is dMded into six sub-tasks: <br /> <br />Sub-task lOa: Document Selected Project <br />Sub-task lOb: Define Required Activities and Studies <br />Sub-task lOc: Analyze Financing Potential <br />Sub-task 10d: Recovery Program Integration <br />Sub-task 10e: Development Schedule <br />Sub-task 10f: Long Term Planning <br />Sub-task 109: Long Term Recovery Program Impacts (contingency) <br /> <br />Task Leader: Dr. Charles M. Brendecke <br /> <br />Key Technical Support: Portions of the development plan will be provided by various study <br />team members in their specific areas of expertise. <br />
The URL can be used to link to this page
Your browser does not support the video tag.