My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12597
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP12597
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:16:43 PM
Creation date
8/2/2007 8:45:43 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
7630.650
Description
Wild and Scenic - Yampa River
State
CO
Basin
Yampa/White
Water Division
6
Date
3/1/1990
Author
Unknown
Title
Yampa River Basin Study 1988-1991 - Multiple Rough Drafts of Scope of Work - With Study Schedule - 03-15-90 through 07-09-90
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />003136 <br /> <br />Plan of Study <br /> <br />66 <br /> <br />TASK 9 <br />FINAL EVALUATION AND SELECIlON OF RECOMMENDED PROjECf <br /> <br />Overview <br /> <br />The objective of Task 9 is to conduct the additional evaluations necessary to support a <br />project selection decision by the TSC and PAG. These additional evaluations would stem <br />from reformulation of project alternatives or definition of new evaluation criteria in Task 8. <br />Additional model runs may or may not be required to carry out these further evaluations, <br />depending on the specific nature of the evaluations required. A maximum of 3 project <br />alternatives, including reformulated alternatives, will be subject to this additional evaluation <br />process. The results will be described in a Task 9 Technical Memorandum to the TSC fo~ <br />their use in selection of a recommended project. Concurrence of the PAG will be sought <br />during a subsequent in-basin PAG meeting. <br /> <br />This task is divided into 3 sul>tasks: <br /> <br />Sul>task 9a: Perform Additional Evaluations as Needed <br />Sul>task 9b: Prepare Task Memorandum <br />Sul>task 9c: TSC Meeting to Select Recommended Project <br /> <br />If no additional evaluations are identified in TaSk 8, Sul>tasks 9a and 9b would be waived. <br /> <br />Task Leader: Dr. Charles M. Brendecke <br /> <br />Key Technical Support: Contributions to evaluations will be requested, as needed, from <br />various study team members. <br />
The URL can be used to link to this page
Your browser does not support the video tag.