Laserfiche WebLink
<br />Ct. <br />Ifi~,: <br /> <br />O:"-~"""3 <br />U\l.l.O <br /> <br />Plan of Study <br /> <br />~o <br /> <br />TASK 6 <br />PROJECf FORMULATION <br /> <br />Overview- <br /> <br />The objective of Task 6 is to formulate specific alternative projects based on the site valuation <br />information generated in Task 5. As defined in the Scope of Work, each project will comprise <br />both near- and long-term water supply components as wen as near-term components to <br />provide flat-water and adjacent tailwater-based recreation opportunities. Projects will rely on <br />the transfer of portions of the Juniper-Cross Mountain water rights with a portion of the <br />rights transferred to instream flow. ' <br /> <br />Alternative projects will be developed fonowing systematic formulation criteria and defined <br />in sufficient detail to suppon the modeling and evaluation ~ork which will be carried out in <br />Task 7. It will also be convenient at this time to refine the criteria for evaluation of project <br />alternatives. <br /> <br />Task 6 is divided into 3 sub-tasks: <br /> <br />Sub-task 6a: Develop Plan Formulation and Evaluation Criteria <br />Sub-task 6b: Develop Preliminary Alternative Projects <br />Sub-task 6c: Reformulate Alternatives <br /> <br />Task Leader: Dr. Charles M. Brendecke <br /> <br />Key Technical Support: Douglas R. taiho <br />