My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12593
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP12593
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:16:42 PM
Creation date
8/2/2007 8:23:22 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8282.500.20
Description
CO River Operations-Accounting - Long Range Reservoir Operation-Annual Operations Studies
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/3/1984
Author
Unknown
Title
1984 Colorado River Operation Study Report - Preliminary and Reviewed Draft - 10-03-84
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />002834 <br /> <br />- <br /> <br />- <br /> <br />can take the maximum possible. This constitutes a refinement of the <br />modeling procedures used in ANNSIM and MONSIM. <br /> <br />SRPMAX = 2.0 * AMINl((SCAPMAX-CAPNORM), (12.0 *AMWDMAX - MWDNORM)) <br /> <br />or <br />SRPMAX = 2.0 * the minimum of either <br />(SCAPMAX-CAPNORM) or (12.0 * AMWDMAX - MWDNORM) <br /> <br />where: <br /> <br />SRPMAX = <br />SCAPMAX = <br />CAP NORM = <br />AMWDMAX = <br />MWDNORM = <br /> <br />maximum category one surplus volume. <br />maximum annual delivery to CAP. <br />normally scheduled annual delivery to CAP. <br />maximum monthly delivery to MWD. <br />normally scheduled annual delivery to MWD. <br /> <br />If CAP cannot take surplus deliveries or if (JYR. LT. (ICAPON + <br /> <br /> <br />IYSUR)) SRPMAX = 12.0 * AMWDMAX - MWDNORM <br /> <br />where: <br /> <br />JYR = <br />ICAPON = <br />IYSUR = <br /> <br />year of operation. <br />year that CAP deliveries begin. <br />number of years from the time when deliveries begin to <br />the time when surplus can be taken by CAP. <br /> <br />7. Limit maximum category one surplus volume to the comput~d annual <br />surplus release for Lake Mead. <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.