My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12593
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP12593
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:16:42 PM
Creation date
8/2/2007 8:23:22 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8282.500.20
Description
CO River Operations-Accounting - Long Range Reservoir Operation-Annual Operations Studies
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/3/1984
Author
Unknown
Title
1984 Colorado River Operation Study Report - Preliminary and Reviewed Draft - 10-03-84
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />002835 <br /> <br />e <br /> <br />e <br /> <br />If (SRPMAX.GT.SRM) SRPMAX = SRM <br /> <br />8. If CAP can take a surplus, then divide category one surplus between <br />CAP and MWD, and distribute this additional quantity of deliveries on a <br />monthly basis. If CAP cannot take a surplus, then the entire category <br />one surplus goes to MWD subject to its capacity limitations. <br /> <br />If CAP cannot take surplus, then: <br /> <br />SRPMWD = SRPMAX * (AMWDMAX - DEMAND (MWD, ISM, IMO))/ <br />'~---... <br />" (12 * AMWDMAX - MWDNORM) <br /> <br />DEMAND (MWD, ISM, IMO) = DEMAND (MWD, ISM, IMO) + SRPMWD <br /> <br />---- <br />y-- \ <br />"( ".. : tC i ,oCI' \ <br />.: ~,'. v I <br />M~~7,~ ,11<(:1 <br />, h:1- ~ t/1 e 1 <br />(5 (.-j'C'/l / <br />e rf" (), (I -../ <br />\ f / <br />\ // <br />..."-------~" <br /> <br />where: <br /> <br />MWDNORM = <br /> <br />normal annual delivery to MWD. <br /> <br />i <br />i <br />I <br />, <br />i <br />! <br />i <br />I <br />i <br />I <br /> <br />SRPMWD = <br /> <br />monthly surplus to MWD. <br /> <br />DEMAND (MWD, ISM, IMO) = scheduled monthly delivery to MWD. <br /> <br />~If CAP can take surplus, then: <br /> <br />SRPCAP =0.5 * SRPMAX * (CAPMAX (IMO) - DEMAND (ICAP, ISC, IMO))/ <br />(SCAPMAX - CAPNORM) <br /> <br />! <br />i <br />I <br />I <br />! <br />i <br />J <br />, <br />J <br />i <br />, <br />i <br />i <br />I <br /> <br />DEMAND (ICAP, ISC, IMO) = DEMAND (ICAP, ISC, IMO) + SRPCAP <br /> <br />and <br /> <br />SRPMWD = 0.5 * SRPMAX * (AMWDMAX - DEMAND (MWD, ISM, IMO))/ <br />(12.0 * AMWDMAX - MWDNORM) <br /> <br />.. <br />. <br />U <br /> <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.