Laserfiche WebLink
<br /> <br />Core Facil ity <br /> <br />Refugia/Broodstock <br /> <br />TABLE 8 <br /> <br />COSTS AND REQUIRED LAND <br />Surface Water Supply (ScenarioJ 300,000~ <br />Recovery Facility Components <br /> <br />Research <br /> <br />Total <br /> <br />Operation and <br />Maintenance <br /> <br />o <br />o <br />t<...l: <br />00 <br />-.] <br />r-.:> <br /> <br />Requi red <br />Land (b) <br /> <br />Residences (3) <br />Hatchery Bui lding <br />Maintenance/Storage Facility <br />Visitor Aquarium Facility <br />Production Ponds <br />Brood Ponds (Augment only) <br />Rearing Water Supply <br />Other Associated Costs (a) <br /> <br /> <br />Quarantine Building <br />Broodstock Bui lding <br />Brood Ponds <br />Broodstock Water Supply <br />Other Associated Costs (a) <br /> <br />Research Building <br />OUtside Research <br />Laboratory Equipment <br />Other Associated Costs (a) <br /> <br />All Options-4 <br /> <br />(a) <br /> <br />t <br /> <br />(b) <br /> <br />~~ <br />'1 <br /> <br /> <br />121, 738,5~0 <br />~ . , <br /> <br />S3,026,876 <br /> <br />$3,080,000 <br /> <br />SZT, 845, 406 <br /> <br />Other associated costs may include some or all of the following: <br />Site WOrk <br />Utfl ities <br />Emergency Power Generation <br />Gas Stabilization Tower <br />Miscellaneous Structures <br />Effluent Treatment <br />'ard Piping <br />Oxygen System <br />Monitoring and Alann System <br />Fish Rearing Equipment <br />Process Water Conditioning <br />AlE Fees (9.51 of total) <br />Penaits (.51 of total) <br />Contingency (151 of total) <br /> <br />Land costs not included clue to Lnlpecified site location. <br /> <br />13 <br /> <br />All FlM"ICt i ons ---1 <br /> <br />$1,032,000 <br /> <br />Acres <br /> <br />~ <br />e <br /> <br />87 <br /> <br />e <br />