My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12584
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP12584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:16:40 PM
Creation date
8/1/2007 2:14:33 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.21
Description
Colorado River Basin Threatened and Endangered Species - UCRBRIP - Hatchery Facilities
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/1/1992
Author
CWCB
Title
State of Colorado Hatchery Feasibility Study for Endangered Fishes of the Colorado River Basin - Edited Drafts-With Status of Study Tasks and Schedules - 09-01-92
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. i <br /> <br />~.~ <br />, <br />, <br /> <br />TABLE 7 <br /> <br /> <br />COSTS AND REQUIRED LAND <br />Warm Well Water Supply (Scenario! 300,000 ) <br />Recovery Facility Components <br /> <br />Core FacH ity <br /> <br />Refugia/Broodstock <br /> <br />Research <br /> <br />Total <br /> <br />All FlIlCtf ons -.:;> ( <br /> <br />Acres ~".-? I <br /> <br />e <br /> <br /> <br />Resic:lences (3) <br />Hatchery Building <br />Maintenance/Storage Facility <br />Visitor Aquarium Facility <br />Procluction Ponds <br />Brood Ponds (Augment only) <br />Rearing Water Supply <br />Other Associated Costs (a) <br /> <br />Research Building <br />Outside Research <br />Laboratory Equipment <br />Other Associated Costs (a) <br /> <br />All Options4 <br /> <br />Quarantine Building <br />Broodstock Building <br />Brood Ponds <br />Broodstock Water Supply <br />Other Associated Costs (a) <br /> <br />TQZti:S <br />~f $15,567,344 <br /> <br />Lq(trt ~ Uv1.~ " <br />CM!t1!~ (ryl~- P ~ fcL _ , <br />okwVh~Ll S ? (lltS ~~ <br />vw+- ~.t\A. .~ <br />.I. W!AV\ t-~ <br />~ClM-'t Lk. <br /> <br />.:J~.>L--r. <br /> <br />Q <br /><:;) <br />t--\ <br />OQ <br />""-J <br />~ <br /> <br />Operation and <br />Maintenance <br /> <br />Required <br />Land (b) <br /> <br />$21,181,094 <br /> <br />67 <br /> <br />$2,802,500 <br /> <br />$3,011,250 <br /> <br />Other associated costs may include some or all of the following: <br />Site Work <br />Uti l ities <br />Emergency Power Generat i on <br />Gas Stabilization Tower <br />Miscellaneous Structures <br />Effluent Treatment <br />Yard Piping <br />Oxygen System <br />Monitoring and Alarm System <br />Fish Rearing Equipment <br />Process Water Conditioning <br />AlE Fees (9.51 of total) <br />Penaits (.51 of total) <br />Contingency (151 of total) <br /> <br />(b) land costs not incl&ted clue to Lnlpecified site location. <br /> <br />(a) <br /> <br /> <br />12 <br /> <br />ti," <br /> <br />$756,000 <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.