Laserfiche WebLink
<br />. i <br /> <br />~.~ <br />, <br />, <br /> <br />TABLE 7 <br /> <br /> <br />COSTS AND REQUIRED LAND <br />Warm Well Water Supply (Scenario! 300,000 ) <br />Recovery Facility Components <br /> <br />Core FacH ity <br /> <br />Refugia/Broodstock <br /> <br />Research <br /> <br />Total <br /> <br />All FlIlCtf ons -.:;> ( <br /> <br />Acres ~".-? I <br /> <br />e <br /> <br /> <br />Resic:lences (3) <br />Hatchery Building <br />Maintenance/Storage Facility <br />Visitor Aquarium Facility <br />Procluction Ponds <br />Brood Ponds (Augment only) <br />Rearing Water Supply <br />Other Associated Costs (a) <br /> <br />Research Building <br />Outside Research <br />Laboratory Equipment <br />Other Associated Costs (a) <br /> <br />All Options4 <br /> <br />Quarantine Building <br />Broodstock Building <br />Brood Ponds <br />Broodstock Water Supply <br />Other Associated Costs (a) <br /> <br />TQZti:S <br />~f $15,567,344 <br /> <br />Lq(trt ~ Uv1.~ " <br />CM!t1!~ (ryl~- P ~ fcL _ , <br />okwVh~Ll S ? (lltS ~~ <br />vw+- ~.t\A. .~ <br />.I. W!AV\ t-~ <br />~ClM-'t Lk. <br /> <br />.:J~.>L--r. <br /> <br />Q <br /><:;) <br />t--\ <br />OQ <br />""-J <br />~ <br /> <br />Operation and <br />Maintenance <br /> <br />Required <br />Land (b) <br /> <br />$21,181,094 <br /> <br />67 <br /> <br />$2,802,500 <br /> <br />$3,011,250 <br /> <br />Other associated costs may include some or all of the following: <br />Site Work <br />Uti l ities <br />Emergency Power Generat i on <br />Gas Stabilization Tower <br />Miscellaneous Structures <br />Effluent Treatment <br />Yard Piping <br />Oxygen System <br />Monitoring and Alarm System <br />Fish Rearing Equipment <br />Process Water Conditioning <br />AlE Fees (9.51 of total) <br />Penaits (.51 of total) <br />Contingency (151 of total) <br /> <br />(b) land costs not incl&ted clue to Lnlpecified site location. <br /> <br />(a) <br /> <br /> <br />12 <br /> <br />ti," <br /> <br />$756,000 <br /> <br />e <br />