Laserfiche WebLink
<br />Core Facfl ity <br />! 'r; ~ , i j " . <br /> <br />Refugia/Broodstock <br /> <br />'..ii. <br />"':"',. <br />Y:',;;,:> 'Res f~;"(:" <br />,;, ..., Hatchery Bui lding <br />, Maintenance/Storage Facility <br />. Visitor Aquarium Facility <br />Production Ponds <br />Brood Ponds (Augment only) <br />Rearing Water Supply <br />Other ~ssociated Costs (a) <br /> <br />Quarantine Building <br />Broodstock Building <br />Brood Ponds <br />Broodstock Water Suppl y <br />Other Associated Costs (a) <br /> <br /> <br />$2,663,760 <br /> <br />TABLE 9 <br /> <br />COSTS AND REQUIRED LAND <br />Cold Well Water Supply (SCenari~300,000) <br />Recovery Facility Components <br /> <br />Research <br /> <br />Total <br /> <br />Research Building <br />Outside Research <br />Laboratory Equipment <br />Other Associated Costs (a) <br /> <br />All Options <br /> <br />$3,010,000 <br /> <br />$25,226,844 <br /> <br />w. <br />. Other associated costs lilY include some or all of the following: <br />Site' Work ' <br />Utfl ities <br />Emergency Power Generat i on <br />Gas Stabillzation Tower <br />Miscellaneous Structures <br />Effluent Treatment <br />Yard Piping <br />Oxygen System <br />.. Monitoring and Alana SyStem <br />Fish Rearing Equipnent <br />Process Water Conditioning <br />AlE Fees (9.51 of total) <br />Penaits (.51 of total) <br />Contingency (151 of total) <br /> <br />Land costs not included ci.Je to WVIpeC'ified site location. <br />. /' ! <br /> <br />14 <br /> <br />Operation and <br />Maintenance <br /> <br />All FU'lCti ons <br /> <br />$979,000 <br /> <br />Acres <br /> <br />o <br />Q <br />~ <br />00 <br />-.J <br />W <br /> <br />Requi red <br />Land (b) <br /> <br />e <br /> <br />81 <br /> <br />e <br />