My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
pd705-TO3-v3 _2_
CWCB
>
IBCC Process Program Material
>
Backfile
>
pd705-TO3-v3 _2_
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 6:01:20 PM
Creation date
7/26/2007 9:15:23 AM
Metadata
Fields
Template:
IBCC Process Program Material
Title
Scope of Work Task Order 2007-003
Date
3/7/2007
IBCC - Doc Type
Program Planning, Budget & Contracts
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
March 7, 2007 – Scope of Work Task Order 200 7 - 003 <br />Technical Support for the Basin Roundtables – Needs Assessment <br /> Work Plan Development and Project Management Assistance <br /> <br />For all four tasks, the Consultant will consider the data collection and analysis efforts <br />in light of the need to establish a common technical platform for these activities. The <br />planning horizon , the data used for population projects, and water use levels will be <br />consistent with other Basin's. <br />Associated fee: $35,000 <br /> <br />1.5 Metro Basin Roundtable <br />1.5.1 Summary of Metro Basin Roundtable Request <br />The Metro B asin R oundtable has requested that a work plan be completed for the <br />following tasks: <br />1) Updating the status of identified projects and processes from SWSI <br />2) Fur ther articulate what the Metro B asin water users are implementing regarding <br />conservatio n and reuse <br />3) Completing the 10,285 study <br />4) Identify potential fallowing arrangements <br />5) Underground storage (aquifer storage and recovery) options in the basin <br />Funding Requested: Not specified. <br /> <br />1.5.2 Metro Basin Roundtable Tasks Authorized under Task O rder 2007 - 003 <br />The Consultant will meet with needs assessment subcommittee two times in person <br />and two times via conference call during March 2007 through June 30, 2007 to define <br />what elements need to be contained in their work plan. The Consultant will dev elop <br />draft sections of the work plan based on these input from these meetings. The <br />Consultant will use information from SWSI 2 to address work plan element 2 above. <br />For all work plan elements, a common technical platform will be considered by the <br />Consultan t. <br />Deliverable: Draft and final w ork plan addressing the roundtable’s 5 elements <br />outlined above. <br />Associated fee: $35,000 <br /> <br />1.6 North Platte Basin Roundtable <br />1.6.1 Summary of North Platte Basin Roundtable Request <br />The North Platte B asin R oundtable has request ed that a work plan be developed to <br />address the following items: <br />? <br /> <br /> <br />8 <br />L: \ CWCB IMAGING \ CALEB \ IBCC PROGRAM MATERIAL \ PROGRAM PLANNING BUDGET & CONTRACTS \ CONTRACTS \ CDM TECH ASSISTANCE CONTRACT \ TO 2007 - 003 - NEEDS ASSESSMENT <br />DEVELOPMENT AND PROJECT MANAGEMENT \ PD705 - TO3 - V3 (2).DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.