My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
pd705-TO3-v3 _2_
CWCB
>
IBCC Process Program Material
>
Backfile
>
pd705-TO3-v3 _2_
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 6:01:20 PM
Creation date
7/26/2007 9:15:23 AM
Metadata
Fields
Template:
IBCC Process Program Material
Title
Scope of Work Task Order 2007-003
Date
3/7/2007
IBCC - Doc Type
Program Planning, Budget & Contracts
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
March 7, 2007 – Scope of Work Task Order 200 7 - 003 <br />Technical Support for the Basin Roundtables – Needs Assessment <br /> Work Plan Development and Project Management Assistance <br /> <br />1) Quantify unappropriated water available in the North Platte River basin. This <br />includes identifying unappropriated water for all beneficial uses and will require <br />quantification by tributary at various locations and times of the year. <br />2) Identify and quantify the non - consumptive uses and needs in the basin <br />3) Address North Platte B asin high altitude crop consumptive use coefficients <br />Funding Requested: $45,000 <br /> <br />1.6.2 North Platte Basin Roundta ble Tasks Authorized under Task Order <br />2007 - 003 <br />The Consultant will meet with needs assessment subcommittee two times in person <br />and two times via conference call during March 2007 through June 30, 2007 to define <br />what elements need to be contained in their w ork plan. The Consultant will develop <br />draft sections of the work plan based on these input from these meetings. The <br />Consultant will use information from SWSI 2 to address work plan elements 1 , 2 and <br />3 above. In addition, the work plan for non - consumptive n eeds developed in the <br />Colorado B asin should be considered for the North Platte B asin. For all work plan <br />elements, a common technical platform will be considered by the Consultant. <br />Deliverable: Draft and final w ork plan addressing the roundtable’s 3 elemen ts <br />outlined above. <br />Associated fee: $35,000 <br /> <br />1.7 South Platte Basin Roundtable <br />1.7.1 Summary of South Platte Basin Roundtable Request <br />The South Platter B asin roundtable adopted the SWSI as its interim basin - wide needs <br />assessment. The roundtable would like a task order develop to address the following <br />refinements to SWSI: <br />1) Determine where the various providers may be looking at the same water as a <br />future supply. This task should include not only M&I providers but agricultural <br />providers as well. These studie s should quantify the amount of overlapping claims. <br />The roundtable recognizes that this competition for the same water can significantly <br />increase the gap between future supply and demand. <br />2) Conduct a detailed analysis of any "unappropriated water" in the Basin, including <br />the amount and location of such waters. This should also include a review of any <br />senior appropriation, if any, currently unutilized or under utilized. <br />? <br /> <br /> <br />9 <br />L: \ CWCB IMAGING \ CALEB \ IBCC PROGRAM MATERIAL \ PROGRAM PLANNING BUDGET & CONTRACTS \ CONTRACTS \ CDM TECH ASSISTANCE CONTRACT \ TO 2007 - 003 - NEEDS ASSESSMENT <br />DEVELOPMENT AND PROJECT MANAGEMENT \ PD705 - TO3 - V3 (2).DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.