Laserfiche WebLink
March 7, 2007 – Scope of Work Task Order 200 7 - 003 <br />Technical Support for the Basin Roundtables – Needs Assessment <br /> Work Plan Development and Project Management Assistance <br /> <br />Associated fee: $35,000 <br /> <br />1 .3 Dolores/San Juan/San Miguel (Southwest) Basin Roundtable <br />1.3.1 Summary of Dolores/San Juan/San Miguel (Southwest) Basin <br />Roundtable Request <br />To further their needs assessment the Dolores/San Juan/San Miguel (Southwest) <br />Basin Roundtable has requested a task order to develop a work plan to address the <br />following: <br />1) Consumptive use assessment – review consumpt ive use needs from SWSI and <br />update based on more recent information such as evaluating additional Colorado <br />River depletions. <br />2) Non - consumptive use assessment – build upon efforts from SWSI Phase 2 to <br />develop assessment of needs for the basin. <br />3) Alternati ves to permanent agriculture dry - up – identify opportunities for <br />alternatives to permanent transfers from irrigated agriculture to M&I uses. <br />4) Analysis and options for water conservation and efficiency – identify possibilities <br />and methods for identifying yields from conservation and efficiency throughout the <br />basin. <br /> <br />Funding Requested: $70,000 <br /> <br />1.3.2 Dolores/San Juan/San Miguel (Southwest) Basin Roundtable Tasks <br />Authorized under Task Order 2007 - 003 <br />The Consultant will meet with needs assessment subcommittee two times in person <br />and two times via conference call during March 2007 through June 30, 2007 to define <br />what elements need to be contained in their work plan. The Consultant will develop <br />draft sections of the work plan based on these input from these meet ings. The <br />Consultant will use information from SWSI 2 to address work plan elements 2, 3 and <br />4 above. In addition, the work plan for non - consumptive needs developed in the <br />Colorado B asin should be considered for the Dolores/San Juan/San Miguel <br />(Southwest) B asin. For all work plan elements, a common technical platform will be <br />considered by the Consultant. <br />Deliverable: Draft and Final Work plan addressing the roundtable’s 4 elements <br />outlined above. <br />Associated fee: $35,000 <br /> <br />1. 4 Gunnison Basin Roundtable <br />1. 4 .1 Summary of Gunnison Basin Roundtable Request <br />The Gunnison B asin R oundtable has requested that the following task s be completed: <br />? <br /> <br /> <br />4 <br />L: \ CWCB IMAGING \ CALEB \ IBCC PROGRAM MATERIAL \ PROGRAM PLANNING BUDGET & CONTRACTS \ CONTRACTS \ CDM TECH ASSISTANCE CONTRACT \ TO 2007 - 003 - NEEDS ASSESSMENT <br />DEVELOPMENT AND PROJECT MANAGEMENT \ PD705 - TO3 - V3 (2).DOC <br />