My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
pd705-TO3-v3 _2_
CWCB
>
IBCC Process Program Material
>
Backfile
>
pd705-TO3-v3 _2_
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 6:01:20 PM
Creation date
7/26/2007 9:15:23 AM
Metadata
Fields
Template:
IBCC Process Program Material
Title
Scope of Work Task Order 2007-003
Date
3/7/2007
IBCC - Doc Type
Program Planning, Budget & Contracts
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
March 7, 2007 – Scope of Work Task Order 200 7 - 003 <br />Technical Support for the Basin Roundtables – Needs Assessment <br /> Work Plan Development and Project Management Assistance <br /> <br />Associated fee: $35,000 <br /> <br />1 .3 Dolores/San Juan/San Miguel (Southwest) Basin Roundtable <br />1.3.1 Summary of Dolores/San Juan/San Miguel (Southwest) Basin <br />Roundtable Request <br />To further their needs assessment the Dolores/San Juan/San Miguel (Southwest) <br />Basin Roundtable has requested a task order to develop a work plan to address the <br />following: <br />1) Consumptive use assessment – review consumpt ive use needs from SWSI and <br />update based on more recent information such as evaluating additional Colorado <br />River depletions. <br />2) Non - consumptive use assessment – build upon efforts from SWSI Phase 2 to <br />develop assessment of needs for the basin. <br />3) Alternati ves to permanent agriculture dry - up – identify opportunities for <br />alternatives to permanent transfers from irrigated agriculture to M&I uses. <br />4) Analysis and options for water conservation and efficiency – identify possibilities <br />and methods for identifying yields from conservation and efficiency throughout the <br />basin. <br /> <br />Funding Requested: $70,000 <br /> <br />1.3.2 Dolores/San Juan/San Miguel (Southwest) Basin Roundtable Tasks <br />Authorized under Task Order 2007 - 003 <br />The Consultant will meet with needs assessment subcommittee two times in person <br />and two times via conference call during March 2007 through June 30, 2007 to define <br />what elements need to be contained in their work plan. The Consultant will develop <br />draft sections of the work plan based on these input from these meet ings. The <br />Consultant will use information from SWSI 2 to address work plan elements 2, 3 and <br />4 above. In addition, the work plan for non - consumptive needs developed in the <br />Colorado B asin should be considered for the Dolores/San Juan/San Miguel <br />(Southwest) B asin. For all work plan elements, a common technical platform will be <br />considered by the Consultant. <br />Deliverable: Draft and Final Work plan addressing the roundtable’s 4 elements <br />outlined above. <br />Associated fee: $35,000 <br /> <br />1. 4 Gunnison Basin Roundtable <br />1. 4 .1 Summary of Gunnison Basin Roundtable Request <br />The Gunnison B asin R oundtable has requested that the following task s be completed: <br />? <br /> <br /> <br />4 <br />L: \ CWCB IMAGING \ CALEB \ IBCC PROGRAM MATERIAL \ PROGRAM PLANNING BUDGET & CONTRACTS \ CONTRACTS \ CDM TECH ASSISTANCE CONTRACT \ TO 2007 - 003 - NEEDS ASSESSMENT <br />DEVELOPMENT AND PROJECT MANAGEMENT \ PD705 - TO3 - V3 (2).DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.