Laserfiche WebLink
March 7, 2007 – Scope of Work Task Order 200 7 - 003 <br />Technical Support for the Basin Roundtables – Needs Assessment <br /> Work Plan Development and Project Management Assistance <br /> <br />1) Basin - wide – Review, refine, and/or confirm the estimate of current and future <br />water demands and supply for the smaller muni cipalities, water districts and <br />domestic water companies in the Gunnison Basin <br />2) Basin - wide – Review and refine the estimate of current and future rural domestic <br />demands and supply in the Gunnison Basin. <br />3) Basin - wide – Identify vulnerabilities to water s upply shortages for Gunnison Basin <br />municipalities. <br />4) Basin - wide – Perform an independent review of the agricultural shortages <br />identified in the SWSI report by enhancing spatial resolution, and extending the <br />period of record to include the recent extremely dry period of 2002 - 2004. <br />5) Basin - wide – Review and refine the analysis of existing physically and legally <br />available water supplies in the Gunnison Basin prepared by SWSI <br />6) Sub - basin Specific: Upper Gunnison – Review, refine, and/or confirm the estimate <br />of future snowmaking demands in the Upper Gunnison Basin. <br />In addition, the Gunnison B asin R oundtable requested that a coordinated statewide <br />effort be made to identify and release existing databases which will be used to <br />describe environmental and recreatio nal needs for each of the roundtables. The <br />roundtable requested that t he use of this information should be coordinated with the <br />development and release of the SWSI 2 results. <br />Funding Requested: Not specified. <br /> <br />1. 4 .2 Gunnison Basin Roundtable Tasks Authori zed under Task Order 2007 - <br />003 <br />During March 2007 through June 30, 2007 the Consultant will address Task 1, Task 2, <br />Task 3 and Task 6. Based on funding constraints, Task 2 will not fully be completed <br />but elements will be discussed with the needs assessment s ubcommittee to further <br />refine the elements to be completed under this task. <br />1) Basin - wide – Review, refine, and/or confirm the estimate of current and future <br />water demands and supply for the smaller municipalities, water districts and <br />domestic water compan ies in the Gunnison Basin <br />The Consultant will investigate many of the smaller municipal areas of the Gunnison <br />Basin with respect to present and future water use. For example, some small <br />communities, including, but not limited to, the small municipalities a nd small <br />domestic water companies in the sub - basins of Surface Creek (Orchard City, <br />Cedaredge, Colby, etc.), North Fork (Hotchkiss, Paonia, Rodgers Mesa, Bone Mesa, <br />Lazear, etc.), Smith Fork (Crawford), Upper Gunnison (Mt. Crested Butte, Pitkin, etc.) <br />? <br /> <br /> <br />5 <br />L: \ CWCB IMAGING \ CALEB \ IBCC PROGRAM MATERIAL \ PROGRAM PLANNING BUDGET & CONTRACTS \ CONTRACTS \ CDM TECH ASSISTANCE CONTRACT \ TO 2007 - 003 - NEEDS ASSESSMENT <br />DEVELOPMENT AND PROJECT MANAGEMENT \ PD705 - TO3 - V3 (2).DOC <br />