My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
pd705-TO3-v3 _2_
CWCB
>
IBCC Process Program Material
>
Backfile
>
pd705-TO3-v3 _2_
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 6:01:20 PM
Creation date
7/26/2007 9:15:23 AM
Metadata
Fields
Template:
IBCC Process Program Material
Title
Scope of Work Task Order 2007-003
Date
3/7/2007
IBCC - Doc Type
Program Planning, Budget & Contracts
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
March 7, 2007 – Scope of Work Task Order 200 7 - 003 <br />Technical Support for the Basin Roundtables – Needs Assessment <br /> Work Plan Development and Project Management Assistance <br /> <br />Fun ding Requested: $70,000 <br /> <br />1.2 .2 Colorado Basin Roundtable Tasks Authorized under Task Order 2007 - <br />003 <br />The Consultant will meet with the non - consumptive needs assessment committee <br />three times betwee n March 2007 and June 30, 2007 to discuss progress on the wor k <br />plan for the no n - consumptive needs assessment. One of these meetings will include a <br />workshop with statewide environmental and recreational interests. The goal is to <br />produce a draft work plan by April 30, 2007 so that the Colorado Basin Roundtable <br />can pla n for funding further non - consumptive needs studies through HB 06 - 1400 , <br />SB 06 - 179 , or other funding mechanisms. The work plan will contain the following <br />elements: <br />Task 1: Definition of Non - Consumptive Needs/Values <br /> <br />? <br />Task 2: Identification of Critical Stream Re aches and associated values <br /> <br />? <br />Task 3: Identification of methods for the Quantification of Needs <br /> <br />? <br />Task 4: Cost Estimate s <br /> <br />? <br />Task 5: Meetings with Non - Consumptive Needs Assessment Subcommittee and <br /> <br />? <br />BRT <br /> <br />The work plan will be structured so that study elements are co nsidered in two or <br />more phases. The first phase will be consideration of the above tasks that can be <br />completed with existing data. Subsequent phases will focus on addressing data gaps <br />such as data collection needs and further refinement of non - consumptive needs. This <br />work plan development will be consistent with development of work plans for non - <br />consumptive needs throughout all the basins as a common technical platform needs <br />to be maintained for evaluating non - consumptive needs. <br />In addition to the non - consu mptive needs work plan, the Consultant will prepare <br />initial sections of a work plan document for conducting the Energy needs study. The <br />Consultant will meet with the Energy needs subcommittee once during March <br />through June 30, 2007 to discuss further compl etion of this work plan. <br />Due to funding limitations between March and June 30, 2007, the Consultant will not <br />address the basin ' s consumptive needs during this time. The work plan to address <br />consumptive needs will be addressed after June 30, 2007. <br />Deliverab les: 1) Draft and Final Work plan for addressing non - consumptive needs; 2) <br />Initial sections of a work plan for energy needs. <br />? <br /> <br /> <br />3 <br />L: \ CWCB IMAGING \ CALEB \ IBCC PROGRAM MATERIAL \ PROGRAM PLANNING BUDGET & CONTRACTS \ CONTRACTS \ CDM TECH ASSISTANCE CONTRACT \ TO 2007 - 003 - NEEDS ASSESSMENT <br />DEVELOPMENT AND PROJECT MANAGEMENT \ PD705 - TO3 - V3 (2).DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.