My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
pd705-TO3-v3 _2_
CWCB
>
IBCC Process Program Material
>
Backfile
>
pd705-TO3-v3 _2_
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 6:01:20 PM
Creation date
7/26/2007 9:15:23 AM
Metadata
Fields
Template:
IBCC Process Program Material
Title
Scope of Work Task Order 2007-003
Date
3/7/2007
IBCC - Doc Type
Program Planning, Budget & Contracts
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
March 7, 2007 – Scope of Work Task Order 200 7 - 003 <br />Technical Support for the Basin Roundtables – Needs Assessment <br /> Work Plan Development and Project Management Assistance <br /> <br />Funding Requested: Not s pecified <br /> <br />1.1.2 Arkansas Basin Roundtable Tasks Authorized under Task Order 2007 - <br />003 <br />The Consultant will conduct three meetings with the needs assessment committee to <br />address their needs matrix. The first meeting will be to facilitate a brainstorming <br />session on the documents that will need to be collected from the Water Resource <br />Research Institute of the Colorado St ate University, the Colorado Water Conservation <br />Board, the Colorado Geological Survey and individual water agencies related to the <br />Arkansas Basin. During the first meeting the Consultant will also work with the needs <br />assessment subcommittee to develop a li st of contacts needed to be made regarding <br />the "working group." Between the first and second meeting, the Consultant will <br />gather materials recommended from the first meeting. During the second meeting the <br />consultant will report out on the data collection e fforts and recommend next steps to <br />the assessment subcommittee. During the third meeting the Consultant will facilitate <br />a meeting between the needs assessment subcommittee and the "working group" to <br />report out on progress made by the Consultant and the USG S on the needs <br />assessment matrix. During the third meeting, next steps for assistance in completing <br />the matrix will be summarized. The Consultant will summarize the action items from <br />each meeting. During the meetings use of the matrix and in context of a c ommon <br />technical platform will be discussed. <br />Deliverables: Bibliographic information and draft matrix for roundtable review. <br />Associated fee: $35,000 <br /> <br />1.2 Colorado Basin Roundtable <br />1.2.1 Summary of Colorado Basin Roundtable Request <br />To further their needs as sessment the Colorado Basin Roundtable has requested a task <br />order to develop a work plan to address the following: <br />1) Non - consumptive needs – develop statewide standard method for developing non - <br />consumptive needs assessment and customize for the Colorado B asin. <br />2) Consumptive use needs – develop a work plan to evaluate future projects to <br />address Colorado Basin's 62,000 AF gap identified in SWSI. <br />3) Energy needs – develop a work plan to execute the joint Colorado and <br />Yampa/White roundtables energy study. <br />? <br /> <br /> <br />2 <br />L: \ CWCB IMAGING \ CALEB \ IBCC PROGRAM MATERIAL \ PROGRAM PLANNING BUDGET & CONTRACTS \ CONTRACTS \ CDM TECH ASSISTANCE CONTRACT \ TO 2007 - 003 - NEEDS ASSESSMENT <br />DEVELOPMENT AND PROJECT MANAGEMENT \ PD705 - TO3 - V3 (2).DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.