My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12486
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP12486
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:16:19 PM
Creation date
7/24/2007 11:03:37 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8221.109
Description
Colorado River Basin Projects - Long Hollow
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/1/2004
Author
Wright Water Engineers
Title
Long Hollow Dam and Reservoir - Phase I Summary Report - Preliminary Drafts - (no final) 05-01-04 through 06-01-04
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />001710 <br /> <br />Long Hollow Dam and Reservoir Summary Report-Preliminary Draft <br /> <br /> Active Channel <br /> Ephemeral <br /> Emergent Perennial <br /> Drainage <br /> Wetland Drainage <br />Government Draw 46,480 FT2 7,040 LF <br /> 700 LF <br /> (1.07 Acres) <br />Long Hollow 62,156 FT2 11,520 LF <br />( 1 .43 Acres) 1,480 LF <br />TOTAL 2.5 Acres 18,560 LF 2,180 LF <br /> <br />6.3.2 Preliminary Mitigation Plan <br /> <br />Impacts from the project to the 18,560 LF (3.52 miles) of active channel (2.5 acres of emergent <br />wetlands and 18,560 LF of perennial drainage) and 2,180 LF of ephemeral drainage will require <br />mitigation. LPWCD has proposed the following mitigation options: <br /> <br />· Wetland Creation. Wetland creation is proposed below the embankment and upstream of <br />the proposed reservoir dam-to mitigate the 2.5 acres of emergent wetland impacts within <br />the LHR footprint. Impacts to emergent wetlands would be mitigated at a ratio Q[greater <br />than 1:1. <br /> <br />· Riparian Corridor Restoration and Enhancement. Impacts to other "Waters" would be <br />mitigated via enhancement and/or restoration of existing riparian areas along Government <br />Draw and Long Hollow. <br /> <br />WWE will work closely with the USACE and other agencies to best address La Plata River basin <br />mitigation needs. <br /> <br />6.4 Cultural Resources <br /> <br />A cultural resources survey and site assessment for LPWCD's proposed LHR project was <br />conducted by La Plata Archaeological Consultants (LP AC) in May and June 2003. A total of <br /> <br />991-077.115 <br />May 2004 <br /> <br />Wright Water Engineers, Inc. <br /> <br />Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.