My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6-12-07 South Platte Minutes
CWCB
>
Board Meetings
>
Backfile
>
Backfile
>
6-12-07 South Platte Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 4:13:05 PM
Creation date
7/18/2007 11:38:24 AM
Metadata
Fields
Template:
Basin Roundtables
Basin Roundtable
South Platte
Title
Minutes
Date
6/12/2007
Basin Roundtables - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Handout: <br /> <br />Table 1: Conditional Water Rights with Conditional Storage <br />Volume 5,000 AF or Greater: <br />Total: 3,784,596 in Conditional Water Rights <br /> <br />Table 2: Total Current and Planned Future Storage with <br />Conditional rights 5,000 AF or Greater: <br />Total: 492,782 Estimated Existing Capacity <br />472,700 Estimated Planned Expansion <br />958,982 Estimated total Planned Capacity <br /> <br />Table 3: Planned Gravel Pit Reservoirs Greater than 1,000 AF <br />Total: 59,700 AF Estimated storage Capacity <br />(total does not include projects where more info is needed) <br /> <br />Table 4: Conditional Water Rights with Recharge Use Type <br />("RCH") Sorted by Administration Number (Sr to Jr) <br />Total: 882 Rate Absolute Water Right (cfs) <br />4,575 Rate Conditional Water Right (cfs) <br /> <br />Table 5a: Water Rights Summary <br />Water Rights: <br />Total Volume: 3,785,000 AF (75 conditonal rights <br />more than 5,000 AF) <br />Conditional Storage Rights with Known Recent Activity: <br />Total Volume: 1,832,000 AF (37) <br />Conditional Recharge Rights: <br />110 number; total Flow Rate: 4,575 <br /> <br />Table 5b: Future Planning Summary <br />Future Planning Projects: <br />Planned Storage Projects: 31, Need date on 8 <br />Estimated Existing Capacity: 493,000 AF <br />Estimated Planned Expansion: 462,000 AF <br />Estimated Total Planned Capacity: 955,000 AF <br />Gravel Lake Reservoirs: 21, Need data on 12 <br />Estimated Total Planned Capacity: <br />More than 59,700 <br /> <br />Discussion: <br />Jim Hall: Would make sense to look at source; some of these <br />questionable; some of these are not reasonable sources. <br /> <br />Philo Shelton: Do we know what volume we are capturing? Where is the <br />logical cut-off? Would be interested in the total; perhaps more logical to <br />go to 2,500 cutoff. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.