My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150221 Contract
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150221 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2011 4:01:35 PM
Creation date
7/17/2007 1:17:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150221
Contractor Name
San Luis Valley Irrigation District
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,,' ! <br /> <br />" ... ~. <br /> <br />2.4.2 Presence of previously-identified federally-listed threatened or <br />endangered species in the project area <br /> <br />2.4,3 Existing geotechnical information <br /> <br />2.4.4 Identify federal, state, and local permit requirements for <br />enlargement of Rio Grande Reservoir <br /> <br />TOTAL COSTS TASK 2: <br /> <br />$16,300.00 <br /> <br />2.5 Task 3: Develop Alternatives <br /> <br />2.5.1 Evaluate various alternate solutions and/or uses of an enlarged <br />Reservoir and, after consultation with OWNER, recommend to <br />OWNER those solutions which in ENGINEER'S judgment best <br />meet OWNER'S requirements for an enlargement of Rio Grande <br />Reservoir <br /> <br />2.5.2 Conceptually identify potential benefits and reservoir sizing <br />implications of an enlarged Rio Grande Reservoir for multiple <br />purposes including: <br /> <br />2.5.2;1 <br /> <br />Compact Storage and Administration <br /> <br />2.5.2.2 <br /> <br />Direct Flow Storage <br /> <br />2.5.2,3 <br /> <br />Recreational Alternatives <br /> <br />2.5.2.4 <br /> <br />Environmental and Riparian Enhancement <br /> <br />2.5.2.5 <br /> <br />Other potential uses <br /> <br />2.5.3 Identify potential sources of funding and strategies for obtaining <br />funding for the costs of an enlargement of Rio Grande Reservoir <br /> <br />TOTAL COSTS TASK 3: <br /> <br />$41,520.00 <br /> <br />2.6 Task 4: Preparation of Final Report <br /> <br />2.6.1 Prepare a draft report which will contain the statement of <br />OWNER'S requirements for an enlargement of Rio Grande <br />Reservoir and summary of findings from Tasks 2 and 3 as <br />described above. The Report will be accompanied by <br />ENGINEER'S opinion of conceptual construction costs, including <br />allowances for contingencies including costs of design <br />professionals and related services. <br /> <br />2.6.2 One meeting with OWNER and CWCB to review draft report <br /> <br />Appendix A to Grant Contract No. C150221 <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.