My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02141
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ02141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 10:31:26 AM
Creation date
7/17/2007 1:02:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150023
Contractor Name
Ryan Gulch Reservoir Company
Contract Type
Loan
Water District
4
County
Larimer
Bill Number
SB 99-173
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ryan Gulch Spillway Rehabilitation Study <br />Plan of Study <br />Page 2 <br />5 Financial Analysis <br />6 Study Report <br />7 Coordination Meetings <br />Memorandum <br />Report <br />Progress Reports <br />Task 1- Data Collection <br />Objective: <br />A thorough knowledge of previous studies will be augmented with published physical information, <br />environmental and water rights issues. The published physical information will include construction drawings <br />of the existing facilities. Researching available information witl develop an understanding of the <br />environmental and water rights issues. <br />Methodology: <br />1. Available water rights information from the Company will be reviewed and tabulated. <br />2. Existing twafoot contour maps will be obtained from the City of Loveland and the Company. Survey <br />spot checks will be identified during the field investigation associated with flow structures, if required. <br />Products: <br />l. A task memorandum will be prepared listing available project information and stating Boyle's <br />understanding of existing facilities, environmental and water rights issues which will impact the <br />project. <br />Task 2 - Hydrologic Anatysis <br />The State Engineer's Office (SEO) is presently reviewing the hydrologic study that was performed by Ed <br />Toms, Consulting Engineer. The study included an incremental damage analysis to justify a lower capacity <br />spillway then the State requires. A summary of the hydrologic analysis will be prepared and included with the <br />report. <br />Task 3 - Alternative Development <br />Objective: <br />Several alternatives will be developed including structural and nonstructural elements in an attempt to identify <br />the least cost combination of ineasures for achieving the study objective. <br />Methodology: <br />1. Identify structural and non-structural plan elements. <br />2. Preliminary evaluate p(an elements to determine which are suitable for further analysis. <br />3. Formulate alternatives using those plan elements, which are carried forward from the first two steps. <br />Products: <br />l. A memorandum will be prepared describing the methods used in formulating a(ternatives from the <br />plan elements. The formulated alternatives will be used in Task 4. <br />� <br />. <br />L� <br />D:�PROJECTS\RYAMRAYN. DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.