My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02141
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ02141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 10:31:26 AM
Creation date
7/17/2007 1:02:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150023
Contractor Name
Ryan Gulch Reservoir Company
Contract Type
Loan
Water District
4
County
Larimer
Bill Number
SB 99-173
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Ryan Gulch Spillway Rehabilitation Study � <br />Plan of Study <br />Page 3 <br />Task 4 - Alternative Evaluation <br />Objective: <br />The alternatives identified in Task 3 must be evaluated to distinguish the differences between the alternatives <br />and to formulate up to three sound system alternatives. <br />Methodology: <br />1. The plan elements will be formulated into system alternatives. The six eva(uation factors used by the <br />CWCB will be used which include the following: <br />a. Description of project outputs or yields; <br />b. Project costs including capital costs, annual costs and cost per unit of output; <br />c. Impacts on the man-made environment, the naturai environment, and existing sociat structure; <br />d. The financial feasibility of the proposed project as measured by the project sponsor's ability <br />to repay alt reimbursable costs; <br />e. Institutional requirements for project implementation; and <br />f. Any special technical problems which should be taken into consideration during the study. <br />2. An evaluation of institutional considerations will be undertaken to obtain compliance of governmental <br />agencies and/or other parties to allow project implementation. Each major institutional considerations <br />will be described in the study report. The results will be presented in a summary table format <br />indicating the type of action required. <br />• 3. A comparative evaluation will be performed, with the Company's assistance, which wil( compare each <br />alternative with all of the other proposed alternatives based on cost, impacts and institutional <br />considerations. <br />4. The project sponsors will be given the opportunity to incorporate their comments and suggestions into <br />the altemative development phase of the study. Two presentations will be given to the Company to <br />incorporate their input into the alternative selection phase. <br />Products.• <br />1. A memorandum wiil be prepared describing the methods used in evaluating the alternative elements <br />including institutional considerations. <br />2. Formulation of plan alternatives and the identification of a recommended alliterative for the project. <br />Task 5 - Financial Analysis <br />Objective: <br />A detailed financial program is required by the CWCB for project funding. The financia( program describes <br />financing arrangements and the sources and uses of funds for the entire period of dept retirement. <br />Methodology: <br />1. Identify and describe methods of proposed project financing which could include CWCB loan, loans <br />from other agencies, or bank notes. Repayment periods and interest rates associated with each type <br />of financing will be described. <br />2. Ultimate sources of funds for repayment of costs will be described in the study report. The repayment <br />funds may include assessments, water saies and grants. <br />• 3. A detailed schedule of estimated annual revenues and annual expenditures for the entire period of debt <br />D:�PROJECTS�RYAMRAYN. DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.