Laserfiche WebLink
� <br />0 <br />F30YLE E/7G//']EERI/']G CO/�PO/z'/=IT/O/7 <br />Suite 200 <br />165 South Union <br />Lakewood, CO 80228 <br />303 / 987 - 3443 <br />PAX 303 / 987 - 3908 <br />APPENDIX A <br />Ryan Gulch Spillway Rehabilitation Study <br />Plan of Study <br />n <br />U <br />• <br />INTRODUCTION <br />This Plan of Study (POS) for the Ryan Crulch Spillway Rehabilitation Study was prepared to adhere <br />to the Colorado Water Conservation Board (CWCB) format as presented in Guidelines for Financial <br />Assistance through the Colorado Water Conservation Board Construction Fund. The POS was <br />developed to systematically evaluate project requirements and tailor the end product to meet these <br />requirements. The process is built on identifying needs, then collecting information and developing <br />solutions in a series of well-defined steps. The process will utilize valued feedback from the Ryan <br />Gulch Reservoir Company (Company) and the CWCB to evaluate progress and reassess results. The <br />schedule is based on the assumption that the contract award will take place on or before July 15, <br />1998 and the completion date of August 31, 1998. <br />The feasibility study will address structural and nonstructural solutions for the spiltway rehabilitation. The <br />selected alternative developed during the feasibility study will go into final design and construction. <br />STUDY OBJECTIVE <br />The objective of the study is to select a financia(ly sound alternative to rehabilitate Ryan Gulch Spillway, <br />which will enable them to deliver their full water decree in a safe and expeditious manner to meet their <br />sharehplders present and future water requirements. <br />DETAILED WORK TASKS <br />The following POS is based on seven (7) major activities. Each task will result in the preparation of one or <br />more deliverables that will be submitted for review and approval in accordance with the attached schedule. <br />The task descriptions are arranged in the order of their performance with the exception of Task 7 Coordination <br />Meetings. It is anticipated that project meetings wiil be held bi-weekly. A summary of the deliverables for <br />the Ryan Gulch Spillway Rehabilitation Feasibility Study are shown in the foltowing table: <br />Task No <br />2 <br />4 <br />Description <br />Data Collection <br />Hydrologic Analysis <br />Alternative Development <br />Alternative Evatuation <br />CONSULTING ENGINEERS <br />Product <br />Memorandum <br />Memorandum <br />Memorandum <br />Memorandum <br />