My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02141
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ02141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 10:31:26 AM
Creation date
7/17/2007 1:02:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150023
Contractor Name
Ryan Gulch Reservoir Company
Contract Type
Loan
Water District
4
County
Larimer
Bill Number
SB 99-173
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Boyle Engineering has submitted a plan of study for the feasibility study with a cost • <br />estimate of $10,900 and a completion date of August 31, 1998. Staff has reviewed and <br />approved the plan of study (copy attached). A$5,000 grant would amount to about 50 <br />percent of the estimated cost of the study. <br />Upon completion of the study, and if the Pr Board in Nov mber 1998 fu ding of the <br />Reservoir Company intends to apply to the <br />spillway enlargement in 1999. <br />Recommendation <br />5taff recommends that the Board approve a grant from the Operational Account of the <br />Severance Tax Trust Fund in FY '99 to the Ryan Gulch Reservoir Company for 50 <br />percent of the cost of the Ryan Gulch Spillway Rehabilitation Study, not to exceed <br />$5,000.00. <br />Cc: Harold Kester, Ryan Gulch Res. Co. <br />Ed Toms, Boyle Engr. <br />Linda Bassi, AGO <br />� <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.