<br />7., B - PRELIMINARY COST ESTIMATE OF ALTERNATIVE IIA: <br /> <br />e <br /> <br />Construct a single permanent diversion near Mt. Harris to serve the Marshall Roberts, Williams, <br />Walker and Shelton Ditches. This alternative includes constructing new earthen canal, new <br />concrete lined canal, enlargement of existing ditches, and other components as described below. <br />\;.. <br /> <br />C <br /> <br />E C <br /> <br />omponent: st. ost <br />A Diversion. A new permanent adjustable height diversion at Mt. Harris $1,041,000 <br /> site serving the Marshall-Roberts and Williams Ditches. <br />C Combined Ditches Marshall-Roberts 20 cfs <br /> Williams 20 cfs <br /> Walker 44 cfs <br /> Shelton 54 cfs (138 cfs total) <br />Cl Construct about 400 ft of new earthen ditch from the new diversion $1,000 <br /> site to the existing Marshall-Roberts Ditch <br />C2 Enlarge about 5,500 feet of the Marshall Roberts Ditch to carry all $1,093,000 <br /> four shares. This includes about 1,000 feet of concrete lined ditch and <br /> 4,500 ft of earth lined ditch from Highway 40 to the Williams Ditch <br /> takeout, a Grassy Creek wasteway, Sage Creek wasteway, measuring <br /> structure, one highway crossing, railroad crossing, farm road crossing, <br /> Hayden Power Plant waterline crossing, two telephone line crossings, <br /> a fiber optic cable crossing, and a natural gas line crossing. <br />C3 Construct 1,000 feet of new earthen ditch to carry the Williams Ditch $78,000 <br /> water (20 cfs) from the Marshall-Roberts Ditch to the Williams Ditch. <br /> This includes two railroad crossings, an inlet structure, a measuring <br /> structure, a telephone line crossing, a fiber optic cable crossing, and a <br /> farm road crossing. <br />C4 Enlarge 10,000 ft. of the Williams Ditch to carry Williams, Walker $159,000 <br /> and Shelton shares (118 cfs) from the Williams takeout to the Walker <br /> and Shelton takeouts. This includes two farm crossings, two phone <br /> line crossings, a turnout structure, and a measuring structure. <br />C5 Construct 1,000 feet of new earthen ditch to carry the Walker and <br /> Shelton Ditch water (98 cfs) from the Williams to the Walker Ditch. <br /> This includes an inlet structure, two drop structures and a railroad <br /> crossing. <br />C6 Enlarge 7,300 feet of the Walker Ditch to carry Walker and Shelton $121,000 <br /> water, including two farm road crossings, two phone line crossings, a <br /> fiber optic crossing and a turn out structure. <br />C7 Construct 1,700 ft. of new ditch from the Walker to the Shelton (54 $16,000 <br /> cfs) including an inlet structure and two-drop structure. <br /> Total estimated cost: $2,562,000 <br /> <br />e <br /> <br />8 <br />