My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02109
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:40 AM
Creation date
7/17/2007 9:52:00 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0038X
Contractor Name
Upper Yampa Water Conservancy District
Contract Type
Miscellaneous
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 7. A - PRELIMINARY COST ESTIMATE OF ALTERNATIVE V: <br />e Com nent: Est. Cost <br /> A Diversion. A n~w permanent adjustable height diversion at Mt. Harris $1,016,000 <br /> .site servin the Marshall-Roberts and Williams Ditches. <br /> C Combined Ditches Marshall-Roberts 20 cfs <br /> Williams 20 cfs <br /> Cl Construct about 400 ft of new earthen ditch from the new diversion $1,000 <br /> site to the existin Marshall-Roberts Ditch <br /> C2 Enlarge about 5,500 feet of the Marshall Roberts Ditch to carry 40 cfs. $673,000 <br /> This includes about 1,000 feet of concrete lined ditch and 4,500 ft of <br /> earth lined ditch from Highway 40 to the Williams Ditch takeout, a <br /> Grassy Creek wasteway, Sage Creek wasteway, measuring structure, <br /> one highway crossing, railroad crossing, f~ road crossing, Hayden <br /> Power Plant waterline crossing, two telephone line crossings, a fiber <br /> o tic cable crossin , and a natural as line crossin . <br /> C3 Construct 1,000 feet of new earthen ditch to carry the Williams Ditch $20,000 <br /> water (20 cfs) from the Marshall-Roberts Ditch to the Williams Ditch. <br /> This includes a railroad crossing, an inlet structure, a measuring <br /> structure, a telephone line crossing, a fiber optic cable crossing, and a <br /> farm road crossin . <br /> D Diversion. A new permanent adjustable height diversion at the $991,000 <br /> Walker head ate site servin the Walker and Shelton Ditches <br /> E Combined ditches Walker 44cfs <br /> Shelton 54 cfs <br /> El Enlarge 7,300 feet of the Walker Ditch to carry Walker and Shelton $121,000 <br /> water, including two farm road crossings, two phone line crossings, a <br /> fiber 0 tic crossin and a turn out structure. <br /> E2 Construct 1,700 ft. of new ditch from the Walker to the Shelton (54 $16,000 <br /> cfs) includin an inlet structure and two-dro structure. <br /> F Construct works to return the Yampa River to its previous course that $150,000 <br /> assed near the Walker Ditch head ate. <br /> Total estimated cost: $2,988,000 <br /> <br />e <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.