My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02105
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:06:27 AM
Creation date
7/17/2007 7:50:29 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0065FX
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Loan
Water District
0
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Chapter V - Evaluation of Alternatives <br /> <br />Table V-4 <br />Construction Cost Estimate <br />Boyd Lake Dam Low-Level Outlet Works <br /> <br />Alternative 3 - Microtunneling <br /> <br />Item No. Item Description Quantity Unit Unit Price Total Cost <br />1 MobilizationlDemobilization 1 Lump Sum $86,000.00 $86,000 <br />2 Demolition 1 Lump Sum $30,000.00 $30,000 <br />3 Dewatering 1 Lump Sum $30,000.00 $30,000 <br />4 Erosion Control 1 Lump Sum $5,000.00 $5,000 <br />5 Earth Excavation 24,300 Cubic Yard $4.00 $97,200 <br />6 Compacted Backfill 10,000 Cubic Yard $5.00 $50,0Q() <br /> Furnish and Install Articulated <br />7 Concrete Mat 1,500 Square Yard. $15.00 $22,500 <br />8 Furnish and Place Pipe Bedding 2,000 Cubic Yard $25.00 $50,0Q() <br />9 Furnish and Place Structural Concrete 200 Cubic Yard $500.00 $100,000 <br /> Furnish and Place 48" CML Steel <br />10 Pipe 50 Linear Feet $220.00 $11,000 <br /> Furnish and Place Mass Concrete for <br />11 Pipe Encasement 45 Cubic Yard $200.00 $9,0Q() <br /> Furnish and Place Specialized <br />12 Backfill 160 Cubic Yard $10.00 $1,600 <br />13 Microtunnel with 48" CML Steel Pipe 250 Linear Feet $950.00 $237,500 <br /> Furnish and Place Grout Behind 48- <br />14 inch CML Steel Pipe 110 Cubic Yard $120.00 $13,200 <br />" Furnish and Place Grout in Existing <br />15 Concrete Arch Tunnel 110 Cubic Yard $120.00 $13,200 <br />16 Furnish and Place Riprap 30 Cubic Yard $60.00 $1,800 <br />17 Furnish and Place 48" RCPPipe 1600 Linear Feet $100.00 $160,000 <br />18 Furnish and Install 48" Sluice Gate 1 Each $8,000.00 $8,000 <br /> Furnish and Place 6' Dia. Manhole for <br />19 Access 4 Each $5,000.00 $20,0Q() <br /> Subtotal Construction Cost $946,0()(J <br />20 20% Contingency $189,200 <br /> Total Estimated Cost (Rounded) $1,135,000 <br /> <br />Boyd Lake Dam Outlet System Feasibility Study 23 <br /> <br />l3o."LE <br />
The URL can be used to link to this page
Your browser does not support the video tag.