Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Chapter V - Evaluation of Alternatives <br /> <br />Table V-3 <br />Construction Cost Estimate <br />Boyd Lake Dam Low-Level Outlet Works <br /> <br />Alternative 2 - Cut and Cover Variation <br /> <br />Item No. Item Description Quantity Unit Unit Price Total Cost <br />1 MobilizationlDemobilization 1 Lump Sum $92,295.00 $92,295 <br />2 Demolition 1 Lump Sum. $60,000.00 $60,()()() <br />3 Dewatering 1 Lump Sum $50,000.00 $50,()()() <br />4 Erosion Control 1 Lump Sum $5,000.00 $5,()()() <br />5 Earth Excavation 47,000 Cubic Yard $4.00 $1 88,()()() <br />6 Compacted Backfill 16,000 Cubic Yard $5.00 $80,()()() <br /> Furnish and Install Articulated <br />7 Concrete Mat 7,000 Square Yard $15.00 $105,000 <br />8 Furnish and Place Pipe Bedding 1,300 Cubic Yard $25.00 . $32,500 <br />9 Furnish and Place Structural Concrete 260 Cubic Yard $500.00 $ 130,()()() <br /> Furnish and Place Mass Concrete for <br />10 Pipe Encasement 200 Cubic Yard $200.00 $40,()()() <br /> Furnish and Place Specialized <br />11 Backfill 700 Cubic Yard $10.00 $7, ()()() <br /> Pipe Jack Under Existing Waterlines <br />12 with 48" RCP 80 Linear Feet $800.00 $64 ,()()() <br /> Furnish and Place Grout in Existing <br />13 Concrete Arch Tunnel 35 Cubic Yard $150.00 $5,25(] <br />14 Furnish and Place Riprap 30 Cubic Yard $60.00 $1,8oo <br />15 Furnish and Place 48" CML Pipe 220 Linear Feet $220.00 $48,4oo <br />16 Furnish and Place 48" RCP Pipe 800 Linear Feet $110.00 $88,000 <br />17 Furnish and Install 48" Sluice Gate 1 Each $8,000.00 $8,()()() <br /> Furnish and Place 6' Dia. Manhole for <br />18 Access 2 Each $5,000.00 $1O,()()() <br /> Subtotal Construction Cost $1,015,245 <br />19 20% Contingency $203,05(] <br /> Total Estimated Cost (Rounded) $1,218,000 <br /> <br />Boyd Lake Dam Outlet System Feasibility Study 22 <br /> <br />ElCJVLE <br />