My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02105
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:06:27 AM
Creation date
7/17/2007 7:50:29 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0065FX
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Loan
Water District
0
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Chapter VI - Selection of Alternative and Financial Plan <br /> <br />Chapter VI - Selection of Alternative and Financial Plan <br /> <br />A. Narrative Description <br /> <br />Table VI-l presents a summary of the alternatives developed for the low-level outlet works <br />and lists their major advantages and disadvantages. Based on construction cost and discussions with <br />the Company, Alternative 3 - Microtunneling, was selected as the preferred alternative and is <br />highlighted in Table VI-I. The construction cost is anticipated to be approximately $1,135,000. <br /> <br />'" \- . 11:9- <br />y\,lv <br /> <br />Table VI-l <br />Comparison of Alternatives <br /> <br />Description Approx. Advantages Disadvantages <br /> Cost <br />Alternative 1- Cut $1,204,000 . Reliable Design. . More pipe to inspect than Alt 2. <br />and Cover Slightly Higher Flow Capacity. <br /> . <br /> . Lower Cost. <br /> . Less Channel Maintenance Than <br /> Alt. 2. <br />. Alternative 2 - Cut $1,218,000 . Reliable Design. . Lower flow capacity. <br />and Cover Variation Less pipe to inspect. More channel maintenance. <br /> . . <br /> . Slightly Higher Cost. <br /> . More excavated material to dispose <br /> of. <br /> . Neighbors may have issues with <br /> open channel. <br />Alternative 3 - $1,135,000 . Reliable Design. . More pipe to inspect than Alt 2. <br />Microtunneling . Less Excavation, Backfill, and <br /> Disturbance to surrounding area. <br /> . Lowest Cost. <br /> . . Less Channel Maintenance than Alt. <br /> 2. <br /> <br />B. Hydraulic and Structural Design Criteria <br /> <br />The primary hydraulic design consideration is the SED requirement of draining the top five <br />feet of the reservoir in five days. This rule is explained in detail in section F.l of Chapter ill. In <br /> <br />Boyd Lake Dam Outlet System Feasibility Study <br /> <br />24 <br /> <br />lf30VLE <br />
The URL can be used to link to this page
Your browser does not support the video tag.