Laserfiche WebLink
<br />'Ill <br /> <br />~ <br /> <br />2, Evaluate each alternative in terms of the amount of water stored, the <br />total capital and operational cost and the costs per acre foot of water <br />stored taking into account si te speci f ic construct ion costs. Di fferent <br />storage capacities wi 11 be considered for each si te and determine the <br />reservoir volume per foot hei ght of dam. ~___"_o...~___L.~_._W__~'__'__ <br /> <br />\ <br />~, ,c. .\ <br />Ir \ <br />{ }'\ y~, <br />----;:: <br />c: <br /> <br />The financial feasibility of each alternative will be discussed, <br />Assessment of engineering, environmental impacts, institutional <br />requirements (including coordination with the US Forest Service, permitting <br />requirements, implementation problems, and special technical problems will <br />be detai led for each option which looks to be economicall y feasible, <br /> <br />3. The report will summarize the differences between the alternatives and <br />describe the criteria used in selecting the best alternative(s), <br />Evaluation of the most practicay~~ternatives and recommendations for hoWl <br />best to increase the Associations total storage capaci tv as well as whether <br />. . <br />it is pract ical to add storage at this time. <br /> <br /> <br />4, Evaluate financial alternatives to fund additional storage if <br />additional storage is found to be in the best interest of the Association. <br /> <br />5. Present a detailed description of the selected alternative{s} including <br />a cost estimate, suggestion for funding sources, an implementation plan, <br />and preliminary design information for each of the renovation sites, <br /> <br />Our firm will work closely with the State Dam Safety Engineer and with <br />representatives of the US Forest Service to prepare an evaluation of alternatives <br />which includes a detailed assessment of the environment, engineering, <br />construction, safety, and Forest Services concerns. We will also work with CWCB <br />and other funding agencies in developing an implementation plan. y' <br /> <br />~\) <br />\.l~) <br />,,~ <br />,..,) <br />~ 0\" <br /> <br />The Association has been working for several years on finding sites to store <br />additional water. They would like to apply the expenses incurred toward our <br />match. We are also in the process of cash funding the repair of another dam, <br />the Elk Wallows, and would like to apply those engineering costs as part of our <br />match. The Association will also cash fund all of the costs of the current study~ <br />which exceed the amount of the grant and will likely cash fund the design work <br />associated with the additional storage and with the repair of the Elk Wallows, <br /> <br />The Association greatly appreciates your ability to assist them in financing this <br />very important information package, If you have any questions or need further 7 <br />information please feel free--to contact me or the Association's President, Tom <br />Alvey. Thank you for your consideration, <br /> <br />Sincerely, <br /> <br />L~~ <br />~~~: Fagan <br /> <br />cc: LeRoux Creek Water Users <br /> <br />i r) <br />V\j v-lo <br />