My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Platte 04.24.07Minutes
CWCB
>
Board Meetings
>
Backfile
>
Backfile
>
North Platte 04.24.07Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 4:16:58 PM
Creation date
7/16/2007 11:22:38 AM
Metadata
Fields
Template:
Basin Roundtables
Basin Roundtable
North Platte
Title
Minutes
Date
4/24/2007
Basin Roundtables - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />North Platte Basin Roundtable Meeting Minutes, April 24, 2007 <br /> <br />2 <br /> <br />Low interest loans for raw water projects, from 2 funding sources (1971 construction <br />fund, 1977 severance tax trust fund). <br />CWCB runs through 30 to 40 million dollars worth of projects annually, but they are <br />searching for larger projects since they have about 50-80 million dollars available. <br /> <br />Kirk explained how the severance tax revenue fund is broken up into CWCB water <br />project loans [DOLA (50%), DNR (25%), and CWCB (25%)]. He also explained which <br />projects are eligible projects: including reservoirs, dam rehabilitation, water supply <br />systems, water rights acquisition. Reservoirs dominate current projects, and their current <br />projects total 140 million dollars. <br /> <br />Currently the CWCB have little to no projects in the North Platte Basin, but Kirk said the <br />CWCB is trying actively pursue projects for this basin. He explained the loan approval <br />process: [Minimum loan is $50,000 (Kirk thinks this is too low), project financing covers <br />up to 90% of total project costs (including engineering), maximum loan term is 30 years. <br />Interest rates = Agricultural- 2.5%, Municipal 3.25%-4.25%, Commercial: 5.25%. They <br />require a one million dollar insurance policy during the life of the loan]. <br /> <br />The loan approval schedule (for loans under 5 million dollars) is as follows: Allow five <br />months for loan approval and loan contracting. [Loans over 5 million have to be <br />approved by the legislature and signed by the governor, and may take over a year to <br />complete the approval process]. The limit may be raised in the near future to include 10 <br />million dollar loans before they have to be approved by the legislature. <br /> <br />The loan billing process and payment schedule is as follows: the borrower needs a <br />feasibility study, including the need for the project, ability to repay, technical feasibility, <br />etc. There are examples on the CWCB website. <br /> <br />Kirk explained CWCB grant programs: there are eight different types, and they also have <br />grant money for large feasibility studies. <br /> <br />Dirk Ramsey asked about projects of this type for small reservoirs. Kirk answered that it <br />depends on how important the reservoir may be to the basin. Kirk said if there are <br />questions to call him and he could answer further on that matter. <br /> <br />Kirk opened the floor for questions. <br /> <br />-Dina Bennett asked if the grants require matching funds. Kirk answered that it depends <br />on the grant. Some have been approved without matching. <br />-Rick Wyatt asked where grants for research are placed. Kirk said under non- <br />reimbursable project investment grants, and grants for projects /studies of statewide <br />impact or importance, and demonstration projects. If there's a benefit to the state, they <br />have a better chance of getting recommended. <br />-Carl Trick II asked Kirk to talk about the relationship between CWCB and IBCC. Kirk <br />said that he can only explain how it impacts his world (not the upper crust of the CWCB), <br />but he did mention that the IBCC has been a gift to this program (CWCB loan program) <br />
The URL can be used to link to this page
Your browser does not support the video tag.